Strategic Study of CAE >> 2008, Volume 10, Issue 5
Quick safety construction technology on electric railway multiple line’s tunnel blast boring
China Railway 11th Bureau Group Co. Ltd., Wuhan 430071, China
Next Previous
Abstract
How to ensure the existing tunnel's safety and the train normal running while the electric railway multiple line tunnel was blast boring? By study and practice,the paper gives an answer through stepped digging method, underholing style, holes scatter and the structure of the hole and detonation technology. It receives good technological achievement and remarkable social and economic benefits in practical application. It provides successful experience for the similar engineering in the future too.
Keywords
electric railway ; the existing tunnel ; multiple line tunnel ; stepped digging ; underholing style
References
[ 1 ] 何广沂.工程爆破节能环保技术[M].北京:中国铁道出版社,2007