Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 1

Technology on settlement monitoring and evaluation in bridge pier in Beijing-Tianjin inter-city railway

China Railway 17th Bureau Group Co.Ltd, Taiyuan 030006, China

Received: 2008-11-10 Revised: 2008-11-24

Next Previous

Abstract

Specific requirements and methods of settlement monitoring which are used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically, and mathematical model and determinant conditions of settlement are proposed simultaneously, taking Beijing-Tianjin inter-city railway as an example.

Figures

图 1

图 2

图 3

图 4

References

[ 1 ] GB50026-93.工程测量规范[S].北京:中国计划出版社,2001[2]GB12897-91.国家一、二等水准测量规范[S].北京:中国标准出版社,1992

[ 2 ] [2006]189.客运专线无砟轨道铁路工程测量暂行规定[S].北京:中国铁道工业出版社,2006

[ 3 ] [2006]158.客运专线铁路无碴轨道铺设条件评估技术指南[S].北京:中国铁道工业出版社,2006

[ 4 ] 李青岳.工程测量学[M].北京:测绘出版社,1993

Related Research