Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 7

Key technologic problems on underwater shield tunnel

Beijing Jiaotong University, Beijing 100044, China

Received: 2009-03-16 Available online: 2009-07-10 14:43:01.000

Next Previous

Abstract

Combined with some underwater shield tunnels such as Wuhan Changjiang tunnel, the determination of reasonable cover thickness, the shield type and key parameter selection are analyzed. The key technology of stabilizing working face, preventing muddy water eruption, preventing tunnel floating, controlling shield direction, excavating long distance, abutting joint underwater, shield launching and arriving are generalized.

Figures

图1

图2

References

[ 1 ] 王梦恕,李典璜,张镜剑,等.岩石隧道掘进机(TBM)施工及工程实例[M].北京:中国铁道出版社,2004

[ 2 ] 蒋树屏,刘元雪,谢锋,等.重庆市朝天门两江隧道越江段盾构法合理覆盖层厚度研究[J].岩石力学与工程学报,2007,26(6):1188-1193 link1

[ 3 ] 唐益群,宋永辉,周念清,等.土压平衡盾构在砂性土中施工问题的试验研究[J].岩石力学与工程学报,2005,24(1):52-56 link1

[ 4 ] 黄学军,马小汀.高水压下泥水盾构掘进技术[J].隧道建设,2004,26(6):39-40,44 link1

[ 5 ] 谭忠盛,洪开荣,万姜林,等.软硬不均地层盾构姿态控制及管片防裂损技术[J].中国工程科学,2006,8(12):92-96 link1

[ 6 ] 洪开荣.广深港大断面特长水下盾构隧道的技术难点分析[J].隧道建设,2007,27(6):1-3,18 link1

Related Research