The Karst development characteristics and countermeasure of Yunwushan Tunnel

1. China Railway 4th Survey and Design Group Co., Ltd., Wuhan 430063, China;

2. Yichang-Wanzhou Railway Construction Headquarters of the Ministry of Railways, Enshi, Hubei 445000, China

Received: 2009-10-29 Available online: 2009-12-15 09:15:24.000

Next Previous

Abstract

The revealed karst, karst features and treatment measures are described in detail, and different types of karst-specific countermeasures are put up. At the same time, it is stressed that in the encounter of large-scale high-pressure water-rich cavity filling, macro-scopical analysis and understanding of the geological background governs in determining the treatment schedule. The by-pass schedule pertaining to large-scale karst cavities during construction is put up, and relatively construction organization is modified to ensure the project term target. All these can provide reference for the construction of the long karst tunnels.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

图16

图17

图18

图19

References

[ 1 ] 铁道第四勘察设计院.宜万铁路宜昌至万州段新建工程施工图—云雾山隧道设计图[R].武汉,2004,12

[ 2 ] 铁道第四勘察设计院.宜万线长大岩溶隧道专项地质勘察—云雾山隧道工程地质勘察报告[R].武汉,2004.3

[ 3 ] 刘招伟,张民庆,王树仁.岩溶隧道灾变预测与处治技术[M].北京:科学出版社,2007