Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 8

Ahead geological forecasting technology of Bieyancao Tunnel on Yichang-Wanzhou Railway

China Railway 20th Bureau Group Corporation, Xi'an 710016, China

Received: 2009-10-25 Available online: 2010-08-10 13:34:33.000

Next Previous

Abstract

Bieyancao Tunnel is a key project and listed as level I risky tunnel on Yichang-Wanzhou Railway. This tunnel's geological condition is very complex especially the developed karst cave and underground river. It is considered that serious geological disasters called "LiuMao"  phenomena are most likely to occur in construction process. The article introduced that with the help of comprehensive ahead geological forecasting ,this tunnel assured the safety and avoided the geological hazard accidents. It also summarizes the comprehensive geological prediction technology of risky tunnel based on the practice.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

Related Research