The split installation and application of offshore wind turbine generator systems

1. CCCC Third Harbor Engineering Co. Ltd., Lianyungang, Jiangsu 222042, China;

2. Engineering Institute of Engineer Corporations, PLA University of Science & Technology, Nanjing 210007, China

Funding project:“十一五”国家科技支撑计划重大项目课题(2006BAA01A27) Received: 2010-07-23 Available online: 2010-11-12 13:07:28.000

Next Previous

Abstract

The installation methods used in offshore wind farm around the world were summarized, and the process of split installation, the set necessity and principles of assembly base were analyzed. 8 kinds of typical land-based assembly programs and the assembly technology of main parts were summarized. An installation method was proposed by sitting of the diving boat. The diving installation ship was made by installing a crane, and was located in the seabed during the operation to hoist the turbine components. The installation method is suitable for offshore wind farm construction. The application of the installation method in the test turbine project of Jiangsu Xiangshui offshore wind farm was introduced in the paper finally.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

References

[ 1 ] 莫为泽,冯宾春,邓杰.海上风电机组安装概述[J].水利水电技术,2009,40(9):4-7. link1

[ 2 ] 温卫军.半潜驳出运沉箱工艺介绍[J].水运工程,2004,(11):57-60. link1

[ 3 ] 曹棉.软体排在长江航道整治工程中的应用[J].水运工程,2004,(9):70-73. link1

Related Research