Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 11

Foundation form and supportingconstruction technique of offshore wind farm

China Zhongtie Major Bridge Engineering Group Co.,Ltd., Wuhan 430050, China

Received: 2010-07-28 Available online: 2010-11-12 13:04:37.000

Next Previous

Abstract

According to the different of depths and geological conditions,and with the combining of the completed offshore wind farm base forms and construction methods, several forms of gravity, single pile, group piles, set of caisson, open caisson and suction barrel base were introduced. To the different foundation forms,the self-elevating platform, the semi-submersible barge shallow draft, piling barge, lifting the overall floating and other appropriate foundation construction methods were proposed,respectively. According to the types of fan unit,the tower tube and installation of the fans were also introduced.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

References

[ 1 ] 秦海岩,庄岳兴,高辉,等.中国海上风电和大型风电基地发展战略研究[R].中国可再生能源规模化发展项目办公室,2009.

Related Research