Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 12

Study on ground settlement of large diameter slurry shield construction in water-rich sandy gravel stratum

1. Technology Center of China Railway Tunnel Group, Luoyang, Henan 471009, China;

2. China Railway Tunnel Group, Luoyang,Henan 471009,China;1. Technology Center of China Railway Tunnel Group, Luoyang, Henan 471009, China

Received: 2010-08-10 Available online: 2010-12-16 13:05:01.000

Next Previous

Abstract

Beijing underground diameter project is located in the water-rich sandy gravel formation, which is through many structures .Through the analysis of actual monitoring results,the law of tunneling parameters to surface subsidence and deformation law of important buildings around were summarized. Deformation control was successful compared with similar projects.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

Related Research