Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 11

Optimization transformation of complicated ventilation system in integration of mine

China Coal Import and Export Corporation, Beijing 100011, China

Received: 2011-08-29 Available online: 2011-11-18 14:21:01.000

Next Previous

Abstract

As a resource integration mine, there were many problems in Tangshangou Mine such as complex ventilation system and much hidden danger. By determining the ventilation resistance and fan performance test and reasonable evaluation of mine ventilation system, the problems of original mine ventilation system were found out and analyzed, and an optimizing and transforming scheme for ventilation system was proposed. The results showed that the resistance of mine ventilation system was reduced and the stability and ability of fighting against natural calamities of mine ventilation network were improved.

Figures

图1

图2

References

[ 1 ] 程绍仁,程建军.矿井通风阻力测定及对几个问题的分析[J].煤矿开采,2006,11(1):72-74. link1

[ 2 ] 陈开岩,陈发明.矿井通风测量数据处理方法的集成与应用[J].中国矿业大学学报,2002,31(6):600-604. link1

[ 3 ] 范杰,张学博,郭飞鹏.鹤壁十矿通风系统优化改造[J].煤矿安全,2006(4):16-19. link1

[ 4 ] 王德明.矿井通风与安全[M].徐州:中国矿业大学出版社,2007.

[ 5 ] 张国枢.通风安全学[M].徐州:中国矿业大学出版社,2007.

Related Research