Taking the construction of the main shaft hoisting in Longgu 1# Coal Mine for example, the organizational characteristics of the well shaft tower and equipments, elevator and other parallel operation of installation construction were introduced, and the technologies of tower shaft slipform construction, six-disc hanging plate installation and permanent elevator installation were described. The paper can provide reference for the similar type of the construction.
Keywords
parallel operations ; well tower sliding ; shaft equipment ; elevator installation ; construction technology
References
[ 1 ] 中国建筑科学研究院。JGJ3-2002高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,20002.
[ 2 ] 中国建筑科学研究院.GB50204-2002混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
[ 3 ] 中华人民共和国建设部.GB50113-2005滑动模板工程技术规范[S].北京:中国建筑工业出版社,2005.
[ 4 ] 中华人民共和国建设部.JGJ65-1989液压滑动模板施工安全技术规程[S].北京:中国建筑工业出版社,1989.
[ 5 ] 中华人民共和国建设部。GB50010-2002混凝土结构设计规范[S]-北京:中国建筑工业出版社,2002.
[ 6 ] 杨益明,马智民,田德文,等,立井井简机电安装工法.YJGF348-2006[S].
[ 7 ] 马智民.井塔提升系统混合施工工艺探讨[J].能源技术与管理,2008(5):102-115.