Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

1. Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department, Taizhou, Jiangsu 225321, China;

2. CCC-SHB Second Engineering Co. Ltd., Xi'an 710119, China

Funding project:交通行业联合科技攻关项目(2008-353-332-170); 江苏省“333高层次人才培养工程”专项资助 Received: 2012-03-15 Available online: 2012-05-14 16:20:22.000

Next Previous

Abstract

Taizhou Bridge is the first three-tower two-span suspension bridge with spans over 1 000 m in the world. Its main spans are 2×1 080 m; the middle tower is a steel frame with longitudinal herringbone shape and lateral gate shape; the side towers are gate shaped concrete frames; the stiff girder consists of flat streamline steel box girders, with a total of 136 steel box girders of about 33 426 t for the whole bridge. This article determines the proper lifting sequence of steel box girders of this threetower suspension bridge by analyzing the effect of steel box girders lifting sequence on structural system and difficulty in construction .

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 杨进.泰州长江公路大桥主桥三塔悬索桥方案设计的技术理念[J].桥梁建设,2007(3):33-35. link1

[ 2 ] 韦世国,吴建强,文武,等.润扬大桥悬索桥钢箱梁吊装技术[J].桥梁建设,2004(4):40-43. link1

[ 3 ] 闫友联,赵有明,金仓,等.特大跨径悬索桥全液压跨缆吊机设计研究[J].桥梁建设,2004(4):13-16. link1