Construction optimization of shallow-buried tunnel in gravel strata based on controlling settlement of the crown

1. College of Civil Engineering and Architecture, Zhejiang University of Technology, Hangzhou 310034, China;

2. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310029, China;

3. School of Transportation, Southeast University, Nanjing 210096, China

Funding project:浙江省科技厅资助项目(2012C21074);浙江省交通厅资助项目(2012H66);浙江工业大学自然科学基金项目(2011XY024) Received: 2012-09-30 Available online: 2013-10-09 15:42:14.000

Next Previous

Abstract

The stability of surrounding rock is closely connected with the settlement of the crown during construction of shallow-buried road tunnel in gravel strata. Therefore, simulation analysis of different construction methods was used to get the settlement law of the crown to optimize the project as a goal controlling settlement of the crown and stability of surrounding rock. At the same time, the better method of construction was put forward to analyze different excavation path and stage length. The result showed that the crown settlement easily took place during excavation of shallow tunnel and with different construction methods, the difference of crown settlement was great. It is found that CRD method is the most appropriate for gravel strata tunnel because the crown settlement is lest and the stress releasing is slow and gradual and the stress transfer is more effective than CD method. Compared with site monitoring, the result is more identical. The conclusion can provide the reference for similar engineering.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 沈才华,童立元,刘松玉. 卵砾石层浅埋公路隧道支护方案的优 化研究[J]. 土木工程学报,2008,41(7):71-75. link1

[ 2 ] 陈尧中,游步上,余俊贤. 卵砾石层隧道变形参数之最佳化回馈 分析[J]. 地下空间与工程学报,2008,4(4):676-685. link1

[ 3 ] 高广运,冯世进,李鸿博. 卵砾石层中隧道考虑松动圈的位移反 分析应用[J]. 地下空间与工程学报,2008,4(1):57-62. link1

[ 4 ] 牛学超,杨仁树.孙忠辉. 卵砾石层大断面斜井井筒支护方法现 场试验研究[J]. 岩土力学,2009,30(增刊):72-78. link1

[ 5 ] 王梦恕,张 梅. 铁路隧道建设理念和设计原则[J]. 中国工程科 学,2009,11(2):3-8. link1

[ 6 ] 肖智旺,钟登华. 基于RBF神经网络算法的连拱隧道围岩变形 预测方法研究[J]. 中国工程科学,2008,10(7):76-81. link1

[ 7 ] 王发明. 电气化铁路二线隧道爆破掘进安全快速施工技术[J]. 中国工程科学,2008,10(5):58-62. link1

[ 8 ] 任少强. 大跨度双连拱公路隧道数值模拟与围岩稳定分析[J]. 中国工程科学,2009,11(8):58-63. link1

[ 9 ] 皇甫明,谭忠盛,王梦恕. 暗挖海底隧道渗流量的解析解及其应 用[J]. 中国工程科学,2009,11(7):66-70. link1

[10] 苗德海,莫阳春,王 伟. 隧道穿越淤泥质充填溶洞施工力学 行为研究[J]. 中国工程科学,2009,11(12):41-46. link1

[11] 郑爱元,谭忠盛,李治国. 沉管隧道基础灌砂模拟试验[J]. 中国 工程科学,2009,11(7):81-85. link1

[12] 陈 亮,黄宏伟,王如路. 近距离上部穿越对原有隧道沉降的 影响分析[J]. 土木工程学报,2006,39(6):83-87. link1

[13] 李术才,朱维申,陈卫忠,等. 弹塑性大位移有限元方法在软岩 隧道变形预估系统研究中的应用[J]. 岩石力学与工程学报, 2002,21(4):466-470. link1

Related Research