The construction and key techniques of the Fourth Nanjing Yangtze River Bridge

Nanjing Major Road & Bridge Construction Commanding Department, Nanjing 210033, China

Received: 2013-05-22 Available online: 2013-08-28 08:26:08.000

Next Previous

Abstract

The Fourth Nanjing Yangtze River Bridge is the first suspension bridge of three-span steel box girder using continuity and flexible bearing system with a main span of 1418 m, and makes use of the flexible bearing system and distributional force transmission system with main rope for the first time. It overcomes the deep foundation design and construction technical problems of oversized "∞" shape diaphragm wall and ultra-large well-sinking under complicated geological conditions, proposes the technologies of main rope mixed-knit and argon-rich gas shielded arc welding, and uses the pavement technique of compound gussasphalt at steel bridge deck. Additionally, it utilizes synthetical technique to control construction quality of bulk mass concrete. This text summarizes the construction management and key technical innovation.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

References

[ 1 ] 南京重大路桥建设指挥部. 南京长江第四大桥工程技术总结 [M]. 北京:人民交通出版社,2013.

[ 2 ] 肖 利,王连新,潘 霄,等. 南京长江四桥南锚碇基坑渗流 控制方案研究[J]. 长江科学院院报,2009(S1):85-88. link1

[ 3 ] 田 欣,牛亚洲,郝胜利,等. 南京长江第四大桥北锚碇钢筋 混凝土榫锚固系统施工关键技术[J]. 公路,2010(6):54-60. link1

[ 4 ] 崔 冰,董 萌,李准华. 大跨度变截面波纹钢腹板PC连续梁 桥的设计[J]. 土木工程学报,2011(9):81-86. link1

[ 5 ] 杨奉举,牛小龙. 南京长江第四大桥南锚碇基础地下连续墙施 工[J]. 桥梁建设,2010(6):77-79,83. link1

[ 6 ] 王宏畅,李国芬. 南京长江四桥浇注式沥青混凝土配合比设计 研究[J]. 公路,2012(8):50-54. link1

[ 7 ] 栾昌花. 南京长江第四大桥主缆架设关键技术[J]. 现代交通技 术,2012(5):45-47. link1

[ 8 ] 牛亚洲,田 欣,郝胜利,等. 南京长江第四大桥北锚碇沉井 施工技术方案综述[J]. 公路,2010(6):1-6. link1

[ 9 ] 武焕陵,崔 冰,李宗平,等. 南京长江第四大桥预制节段拼 装箱梁的技术特色[J]. 现代交通技术,2011(3):26-29. link1

[10] 刘 钊,武焕陵,种艾秀,等. 南京长江第四大桥节段预制拼 装箱梁足尺模型试验[J]. 桥梁建设,2011(3):9-12,16. link1