Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2013, Volume 15, Issue 12

Several issues to be further considered in construction of Bohai Strait crossing passage

1. China Railway Tunnel Group Co. Ltd., Luoyang, Henan 471009, China;

2. State Key Laboratory for Shield and Boring Technology, Zhengzhou 450001, China

Received: 2013-11-04 Available online: 2013-12-02 13:28:28.000

Next Previous

Abstract

Bohai Strait crossing passage is a strategic project, which has a significant role in boosting the development of Bohai surrounding economic zone and East China. In the paper,the construction mode,longitudinal profile, construction methods and planning of Bohai Strait crossing passage is further studied on basis of the common concept of tunnel crossing Laotieshan waterway. It is proposed that the form of full tunnel with two underground stations built in backfilled ground in the sea should be adopted for Bohai Strait crossing passage and that the tunnel should be constructed by open tunnel boring machine (TBM) method, with drill and blast as the assisting method.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 王梦恕,宋克志. 渤海湾跨海通道建设的紧迫性及现实条件和 初步方案[J]. 北京交通大学学报,2013,37(1):1-10. link1

[ 2 ] 魏礼群,柳新华. 渤海海峡跨海通道若干重大问题研究[M]. 2 版. 北京:经济科学出版社,2009.

[ 3 ] 谭忠盛,王梦恕,罗时祥. 琼州海峡铁路隧道方案初步比选分析 [J]. 中国工程科学,2009,11(7):39-44. link1

[ 4 ] 孙羹尧. 桥隧方案比较刍议[J]. 桥梁与隧道 2013,10:20-24.

Related Research