Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer

Tianjin University, Tianjin 300072, China

Received: 2013-11-23 Available online: 2015-01-13 10:49:41.000

Next Previous

Abstract

This article takes Xia-Zhang highway (Xiamen section) Dongfu tunnel construction as an example. Introduces the application of ?299 big pipe follow with pipe drilling occlusal and linking reinforcement technology+cross-located right next door after disassembly type excavation technology in shallow-buried rich water soft soil stratum tunnel excavation process. While using TGMIS dynamic intelligent monitoring system of construction settlement conditions for data acquisition, analysis and processing, make the deformation of surrounding rock control, successfully passed the construction of shallow-buried soft soil excavation.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

References

[ 1 ] 任 懿. 黄土隧道软弱土层施工技术[J]. 西昌学院学报:自然科 学版,2013(1):51-54. link1

[ 2 ] 肖 剑. 鹤顶山隧道超前预支护大管棚跟管钻进施工技术[J]. 科技资讯,2007(18):39-40. link1

[ 3 ] 熊国武. 大跨度断面的眼镜法施工技术研究[J]. 云南科技管理, 2012(1):51-54. link1

[ 4 ] 齐 琳,闫亚丽. 车道公路隧道软弱围岩段施工方法探讨[J]. 公 路隧道,2010(4):15-21. link1

Related Research