Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2014, Volume 16, Issue 11

Research on initiation network reliability of viaduct demolition blasting

1. The Key Laberatory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources, Changjiang River Scientific Research Institute,Wuhan 430014,China;

2. Wuhan Blasting Engineering Co. Ltd.,Wuhan 430023,China

Received: 2014-09-01 Available online: 2014-11-21 10:48:00.000

Next Previous

Abstract

Non-electric initiation system was the only initiation system for viaduct blasting demolition. Aimed at the application actuality, the relay point characteristicof multiple parallel detonator initiation system was studied in the paper, and the simple formula for mean value of the relay point initiation time was put forward. Reliability standard for non-electric initiationsystem of different scale was established. Duplex-cross non-electric initiation systemwas invented, which not only can avoid side roll in the viaduct collapse process, but also can elevate the reliability of the relay point. Research achievements can provide theoretical basis for viaduct blasting demolition initiation system design.

Figures

图1

图2

图3

References

[ 1 ] 赵 根,贾永胜. 互动有序起爆网路在城市拆除爆破中的应用 [J]. 爆破,2003,20(增刊):22-26.

[ 2 ] 赵 根,吴新霞,刘美山,等. 水工围堰拆除爆破[M].北京:中国 水利水电出版社,2009.

[ 3 ] 张正宇,张文煊,吴新霞,等. 现代水利水电工程爆破[M].北京: 中国水利水电出版社,2003.

[ 4 ] 张正宇,赵 根,张文煊,等. 塑料导爆管起爆系统理论与实践 [M].北京:中国水利水电出版社,2009.

[ 5 ] 武汉爆破有限公司. 武汉沌阳高架桥爆破拆除技术设计与施工 组织设计[R]. 2013.

Related Research