Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2015, Volume 17, Issue 4

High-speed train bogie technology research of coupled systems in high-speed trains

Research & Development Center, Changchun Railway Vehicles Co. Ltd., Changchun 130062, China

Received: 2014-12-20 Available online: 2015-04-20 15:38:29.000

Next Previous

Abstract

High-speed railway propose higher requirements on the bogie technology,in order to design a super performance of electric multiple unit (EMU) bogie, investigate the line condition of China passenger dedicated railway,and also investigate the wheel tread wear of EMU,use actual measurement rail profile and worn profile tread analysis the matching relationship of wheel and rail. Dynamics analysis consider nonlinear characteristics of box guidance node,anti-hunting damper,air spring and other parts,and consider the parameters changes at different high and low temperature variations,also consider motor elastic suspension mode,basic on above factor,build vehicle dynamics model with actual wheel rail matching relationship,through system simulation optimal selection of suspension parameters,combined with the test stand construction design. In order to grasp the key parts of bogie service period reliability,take a great deal dynamic stress test,use the test data analysis maintenance vehicle operating cycle,different climatic conditions,different line conditions on the ballastless track of China,setup China high-speed train load spectrum. Through system integration of the structure design,suspension,transmission,brake,wheel rail noise,structure welding and so on,the high-speed train bogie technology system was founded.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

图16

图17

图18

图19

图20

图21

References

[ 1 ] 池茂如. CRH3动车组踏面改良设计报告[R]. 成都:西南交通大 学,2014.

[ 2 ] 罗 仁. 标准动车组S1002CN踏面动力学性能计算报告[R]. 成 都:西南交通大学,2014.

[ 3 ] 毛 贺. 高速列车载荷谱编制方法的研究[D]. 北京:北京交通 大学,2009. link1

Related Research