Abstract

The connotation and necessity of testing and commissioning of high-speed railway is explained and discussed, combined with the engineering practice of testing and commissioning in China, the key technology of testing and commissioning of high-speed railway are analyzed from the perspective of wheel/rail interaction, pantograph and ocs relation, aerodynamics of high-speed railway and train-track-bridge coupling. Then the main achievements of testing and commissioning of high-speed railway in China are concluded, and some useful suggestions are given about high-speed railway construction and operation.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

References

[ 1 ] 康 熊.铁路试验检测评估技术[M].北京:中国铁道出版社, 2012.

[ 2 ] 田新宇,黎国清,陈东生.高速铁路轨道不平顺管理标准试验研 究[J].中国铁路,2012(9):37-40. link1

[ 3 ] 王卫东,牛留斌,刘金朝.基于轴箱垂向加速度中高频轮轨垂向 力软测量模型[J].中国铁道科学,2013(2):100-105. link1

[ 4 ] 康 熊,王卫东,刘金朝.基于RAMS的高速铁路轨道平顺状态 综合评价体系研究[J].中国铁道科学,2013(2):13-17. link1

[ 5 ] 王卫东,刘金朝,梁志明.综合评价车辆/轨道系统动态特性的广 义能量法[J].中国铁道科学,2009(5):22-27. link1

[ 6 ] 田新宇,黎国清,陈东生.高速铁路轨道不平顺管理标准试验研 究[J].中国铁路,2012(9):37-40. link1

[ 7 ] 康 熊,刘秀波,李红艳,等. 高速铁路无砟轨道不平顺谱[J].中 国科学:技术科学,2014,44(7):687-696. link1

[ 8 ] 康 熊,曾宇清.车辆振动加速度响应分析的速度——频域方 法[J].中国铁道科学,2012(1):60-70. link1

[ 9 ] 王 峰,姚建伟,张 骏,等.高速铁路联调联试管理与技术[M]. 北京:中国铁道出版社,2013.

[10] 高速铁路工程动态验收技术规范[S]//中华人民共和国行业标 准. 北京:中国铁道出版社,2013.