The Prospect of Power Generation Technology Based on Coal Staged Conversion

State Key Laboratory of Clean Energy Utilization (Zhejiang University), Hangzhou 310027, China

Funding project:中国工程院重大咨询项目”推动能源生产和消费革命战略研究“(2011-ZD-14) Received: 2015-11-09 Revised: 2015-11-12 Available online: 2016-01-04

Next Previous

Abstract

In the face of the coal-dominated primary energy structure, increasing energy demand, and serious air pollution, the sustainable development of energy system integrated resources, energy and environment is the direction of China’s energy strategy. This paper introduces a new technology of coal conversion and utilization based on coal staged conversion technology on the concept of “coal is not only energy but also resource”. From the aspects of energy conservation and emission reduction, the development of this technology is prospected. It is pointed out that this technology can improve the comprehensive efficiency of coal power generation, changes the industrial structure and forms a new industrial chain, and ease the shortage of oil and gas in China. It is of great significance to change and optimize the structure of China coal power industry, cyclic economy and energy conservation and emission reduction.

Figures

图1

图2

References

[ 1 ] 中华人民共和国国家统计局. 中国统计年鉴[M]. 北京: 中国统 计出版社, 2014.

[ 2 ] 梁晓晔. 煤基多联产系统的全生命周期评价及关键问题研究 [D]. 杭州: 浙江大学博士学位论文, 2013. link1

[ 3 ] 郭志航. 褐煤热解分级转化多联产工艺的关键问题研究[D]. 杭州: 浙江大学博士学位论文, 2015. link1

[ 4 ] 岑可法, 骆仲泱, 方梦祥, 等. 新颖的热、电、燃气三联产装置[J]. 能源工程, 1995(1): 17–19. link1

[ 5 ] 方梦祥, 骆仲泱, 王勤辉, 等. 循环流化床热、电、气三联产装 置的开发和应用前景分析[J]. 动力工程. 1997, 17(4): 21–27. link1

[ 6 ] 骆仲泱, 方梦祥, 王勤辉, 等. 循环流化床热电气焦油多联产装 置及其方法: 200610154581X[P]. 2007.06.13.

[ 7 ] 吕小兰. 煤部分气化燃烧集成系统的研究[D]. 杭州: 浙江大学 硕士学位论文, 2002. link1

[ 8 ] 刘耀鑫. 循环流化床热电气多联产试验及理论研究[D]. 杭州: 浙江大学博士学位论文, 2005. link1

[ 9 ] 王勤辉, 骆仲泱, 方梦祥, 等. 12兆瓦热电气多联产装置的开发 [J]. 燃料化学学报, 2002, 30(2): 141–146. link1

[10] 方梦祥, 岑建孟, 石振晶, 等. 75 t/h 循环流化床多联产装置试验 研究[J]. 中国电机工程学报, 2010, 30(29): 9–15. link1

[11] 方梦祥, 岑建孟, 王勤辉, 等. 25 MW 循环流化床热、电、煤气 多联产装置[J]. 动力工程, 2007, 27(4): 635–639. link1

[12] 岑可法, 骆仲泱, 王勤辉, 等. 煤的热电气多联产技术及工程实 例[M]. 北京: 化学工业出版社, 2004.

Related Research