Contents Volume 11 · Issue 3 · 2009. Pages 1-96 16 articles
Cultivating innovation capability of enterprise is an important task of Sutong Bridge construction
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 4-7 doi:
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 8-13 doi:
Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 14-19 doi:
Study on stuctural system of Sutong Bridge
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 20-25 doi:
Study on longitudinal wind load calculation method of cables for cablestayed bridge
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 26-30 doi:
Aerodynamic problems of cable-stayed bridges spanning over one thousand meters
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 31-37 doi:
Design and construction of Sutong Bridge deep-water main pylon foundations
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 38-43 doi:
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 44-50 doi:
Design and construction of Sutong Bridge twoer
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 51-56 doi:
Research of 1 770 MPa galvanized steel wire for stay cable of domestic bridges
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 57-64 doi:
Research on the special lifting device for steel box girders of Sutong Bridge
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 65-70 doi:
Technology for long cable erection of a thousand-meter scale cable-stayed bridge
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 71-74 doi:
Assistant pullback technology for main span closure of Sutong Bridge
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 75-80 doi:
Structural stability analysis of Sutong Yangtze River Highway Bridge during construction
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 81-84 doi:
Sutong Bridge--construction and control technology of the superstructure
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 85-91 doi:
Practice and experience of engineering culture development in Sutong Bridge project
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 92-96 doi: