Search scope:
排序: Display mode:
Phase Ⅲ RCC Cofferdam Construction of TGP
Zhang Shuguang
Strategic Study of CAE 2003, Volume 5, Issue 11, Pages 79-81
The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works.the construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC
Keywords: TGP RCC cofferdam concrete
Dynamic simulation based optimized design method of concrete production system for RCC dam
ZHAO Chunju, ZHOU Yihong
Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 4, Pages 405-410 doi: 10.1007/s11709-007-0055-6
Keywords: interacted dynamic simulation construction resource RCC
Application of entropy-based fuzzy matter-element analysis in seepage monitoring of RCC dam
Chongshi GU, Zhijun ZHANG, Xin CAI, Yue HOU
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1, Pages 105-111 doi: 10.1007/s11709-010-0015-4
Keywords: information entropy fuzzy matter-element roller compacted concrete (RCC) dam seepage analysis
Intelligent compaction theory of high roller compacted concrete dam
Liu Donghai,Li Bingyang,Cui Bo
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 74-79
In the paper, the concept and realization process of intelligent compaction for high roller compacted concrete dam construction was presented, as well as the theory of real-time monitoring and intelligent feedback control. Based on the analysis of real-time compaction index, a multiple regression model of the dam compactness was established and a real-time estimation method of compaction quality of the entire work area for roller compacted concrete dam was proposed finally. The adaptive adjustment of the roller work parameters was achieved, with the speed, exciting force, the rolling pass and the compacted thickness meeting the standard during the entire construction process, and the compaction quality and construction efficiency can be both improved as a result. What's more, the research provides a new way for the construction quality control of roller compacted concrete dam.
Keywords: roller compacted concrete(RCC)dam quality control intelligent compaction real-time monitoring real-time
Title Author Date Type Operation
Dynamic simulation based optimized design method of concrete production system for RCC dam
ZHAO Chunju, ZHOU Yihong
Journal Article
Application of entropy-based fuzzy matter-element analysis in seepage monitoring of RCC dam
Chongshi GU, Zhijun ZHANG, Xin CAI, Yue HOU
Journal Article