Resource Type

Journal Article 1

Year

2018 1

Keywords

full depth reclamation 1

raveling 1

Search scope:

排序: Display mode:

Investigating the raveling test for full-depth reclamation

Robert HILL, Andrew BRAHAM

Frontiers of Structural and Civil Engineering 2018, Volume 12, Issue 2,   Pages 222-226 doi: 10.1007/s11709-017-0423-9

Abstract: This should not be done too quickly or raveling occurs.In this study, the “Raveling test of cold mixed bituminous emulsion samples” (ASTM D7196) was used toRaveling test data was collected from 0 to 48 hours of curing, however, samples were often not able toTherefore, the “time lasted” (the time the raveling head loses contact with the surface of the sample

Keywords: raveling     full depth reclamation    

Title Author Date Type Operation

Investigating the raveling test for full-depth reclamation

Robert HILL, Andrew BRAHAM

Journal Article