Search scope:
排序: Display mode:
Saddle pushing analysis in suspension bridge construction
Qi Dongchun,Wang Changjiang,Shen Ruli,Lin Qia
Strategic Study of CAE 2010, Volume 12, Issue 7, Pages 68-73
Some problems existing in saddle pushing, such as the pre-displacementprinciple, the relation of tower top displacement and tower bottom stress, the method of determining saddleThe reasonable model of saddle equilibrium condition and the pre-displacement calculation method areCombining with saddle pushing analysis of Baling River Bridge, the conclusion that the excess pushingThe cases following saddle pushing are the unfavorable conditions for main cables anti-sliding checking
Keywords: suspension bridge saddle pushing saddle equilibrium condition tower top displacement tower bottom
Anti-sliding safety assessment for main saddle on middle tower of Taizhou Bridge
Ruan Xin,Ruan Jing,Chen Airong and Guo Ji
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 71-74
Keywords: three-tower two-span suspension bridge middle tower saddle deterministic assessment probabilistic
Research on analysis method of suspension bridge based on ANSYS
Xie Xuefeng and Luo Xiheng
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 101-105
Keywords: suspension bridge ANSYS-secondary-development saddle incremental launching unstressed length iteration
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 54-59
Unlike single-span suspension bridge,the three -span continuous suspension bridge is mainly characterized by slings set in both side spans, and the continuous transition of stiffening girders between the mid and side spans achieved by girders without slings in the main tower region, and usually restraint equipments set on the side span transition piers to achieve the coordinated deformation between the main cables and stiffening girders in the region, so the lifting method and key construction process for the stiffening girders of the type of suspension bridge is relatively complex. the Fourth Nanjing Yangtze River Bridge as the background, and according to the structural features of the large span three-span continuous suspension bridge, the reasonable lifting program is determined through the comparison and analysis on two different types of lifting sequence for steel box girders.
Keywords: three-span continuous suspension bridge steel box girder lifting program closure saddle pushing
Title Author Date Type Operation
Saddle pushing analysis in suspension bridge construction
Qi Dongchun,Wang Changjiang,Shen Ruli,Lin Qia
Journal Article
Anti-sliding safety assessment for main saddle on middle tower of Taizhou Bridge
Ruan Xin,Ruan Jing,Chen Airong and Guo Ji
Journal Article
Research on analysis method of suspension bridge based on ANSYS
Xie Xuefeng and Luo Xiheng
Journal Article