Resource Type

Journal Article 670

Conference Videos 44

Year

2024 1

2023 35

2022 51

2021 64

2020 28

2019 37

2018 29

2017 46

2016 18

2015 27

2014 23

2013 44

2012 34

2011 41

2010 50

2009 57

2008 21

2007 21

2006 11

2005 8

open ︾

Keywords

construction 28

ecological civilization 17

construction management 15

Three Gorges Project 11

construction technology 10

system construction 10

tunnel 9

construction industry 7

sustainable development 7

shield tunnel 6

construction project 5

project management 5

BIM 4

Bohai Strait 4

Sutong Bridge 4

Three Gorges Project ship lift 4

ecological civilization construction 4

green construction 4

numerical simulation 4

open ︾

Search scope:

排序: Display mode:

Large-scale model test study on the water pressure resistance of construction joints of karst tunnel

Frontiers of Structural and Civil Engineering   Pages 1249-1263 doi: 10.1007/s11709-023-0974-x

Abstract: Model tests and numerical calculations were adopted based on the New Yuanliangshan tunnel project toinvestigate the water pressure resistance of lining construction joints in high-pressure and water-richThe effects of the embedded position and waterstop type on the water pressure resistance of the constructionThe water pressure resistance of the lining construction joint is positively correlated with the liningThe water pressure resistance of the construction joint determined via numerical calculations is similar

Keywords: karst tunnel     lining construction joint     water pressure resistance     large-scale model test     numerical    

Construction risks of Huaying mount tunnel and countermeasures

Haibo YAO, Feng GAO, Shigang YU, Wei DANG

Frontiers of Structural and Civil Engineering 2017, Volume 11, Issue 3,   Pages 279-285 doi: 10.1007/s11709-017-0414-x

Abstract: inrush because of existence of faults, high pressure gas, karst tectonics and coal goafs around the tunnelIn order to cope with the high risk, two main countermeasures were taken to ensure security of construction

Keywords: tunnel?construction     gas?outburst     geology?prediction     automatic?monitoring?system    

Design and construction technology of underwater tunnel

Wang Mengshu

Strategic Study of CAE 2009, Volume 11, Issue 7,   Pages 4-10

Abstract: justify;">It is briefly introduced that when passing over or crossing rivers, lakes and seas, underwater tunnelconstruction method is preferred to be adopted for its summed advantages.The survey of design and construction, key construction technology and frequently-used construction methodof underwater tunnel are also discussed in this article.

Keywords: underwater tunnel     design     construction    

Construction technology of Wuhan Changjiang tunnel―the first tunnel under Changjiang River

Wang Mengshu,Sun Mou,Tan Zhongsheng

Strategic Study of CAE 2009, Volume 11, Issue 7,   Pages 11-17

Abstract:

Wuhan Changjiang tunnel is the first tunnel under Changjiang River.The paper introduced the process of design and research of the project, the construction model, the overalldesign and general situation of the construction.

Keywords: Wuhan Changjiang tunnel     construction model     overall design     construction    

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnelconstruction big data

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 4,   Pages 401-413 doi: 10.1007/s11709-022-0823-3

Abstract: Real-time dynamic adjustment of the tunnel bore machine (TBM) advance rate according to the rock-machineinteraction parameters is of great significance to the adaptability of TBM and its efficiency in constructiondata from the Jilin Water-Diversion Tunnel Project in China.The work provides a new concept of real-time prediction of the TBM performance for highly efficient tunnelconstruction.

Keywords: hard rock tunnel     tunnel bore machine advance rate prediction     temporal convolutional networks     softcomputing     construction big data    

Experiences and Lessons From the Construction of Erlang Shan Tunnel

Zheng Daofang

Strategic Study of CAE 2000, Volume 2, Issue 1,   Pages 62-67

Abstract: Tibet Highway and the project comparison of line alternatives, and presents the reasons of building a tunnelin the area, the tunnel alignment and the problems occurred in the construction.The dialectical relationships between a tunnel and its linking works, between a key project and an ordinaryand lessons are also summarized, which will enlighten both the organizers and the designers on the construction

Keywords: Erlangshan     tunnel construction     experiences    

The location choice and construction technology of shafts in Bohai Strait tunnel

Wang Yunlong,Tan Zhongsheng

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 85-89

Abstract: and the highway;the construction of the crossing is significant.Based on the whole tunnel scheme of Bohai Strait, the location choice and construction technology ofshafts in Bohai Strait subsea tunnel were researched in this paper.According to the construction technology analyses of shafts in mine, railway tunnel and road tunnel,aconstruction of base rock section should take the reasonable crack grouting technology.

Keywords: subsea tunnel     shaft     ventilation     construction technology    

Research on construction optimization of asymmetric double arch section in Jiaozhou Bay Subsea Tunnel

Wang Kai,Zhang Chengping,Wang Mengshu

Strategic Study of CAE 2012, Volume 14, Issue 1,   Pages 90-97

Abstract:

Aiming at the asymmetric double-arch tunnel engineering that lies atJiaozhou Bay in Qingdao, the section located in the intersection between main tunnel and ramb tunnelFour construction schemes are constituted according to different construction sequences and differentIt concludes that the surrounding rock deformation could be better controlled by using of the constructionsequence that first middle drift and then right hole of ramb tunnel, and the reasonable construction

Keywords: subsea tunnel     asymmetric double arch tunnel     construction scheme optimization     construction sequence    

Grouting construction technology of high pressure and rich water fault F11 in Qiyueshan Tunnel

Zhuo Yue,Sun Guoqing

Strategic Study of CAE 2009, Volume 11, Issue 12,   Pages 82-86

Abstract:

Karst caves and faults are big challenges in tunnel construction.Water gushing happens in these strata frequently, which affects construction schedule and constructionQiyueshan Tunnel on Yichang-Wanzhou Railway crosses underground rivers, karst caves and fractured faultspressure, large volume of water gushing and complicated geological condition, is the key of the whole tunnelscheme, new construction technology and new effect examination method for water control and rock collapse

Keywords: Qiyueshan Tunnel     fractured fault     technical challenges     new construction scheme     new construction technology    

Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel

Qu Shouxin

Strategic Study of CAE 2009, Volume 11, Issue 7,   Pages 24-29

Abstract:

A comparison of the bridge programs and the tunnel programs for the projectAnd there is a preliminary and brief conclusion for the construction of the Chinese first subsea tunnel, which contains the characteristics and difficulties and disadvantages of the construction.

Keywords: Xiamen Xiang’an subsea tunnel     construction technology     preliminary conclusions of experience    

Key technology of design and construction on immersed tube tunnel

Du Chaowei,Wang Xiuying

Strategic Study of CAE 2009, Volume 11, Issue 7,   Pages 76-80

Abstract:

Combined with the built immersed tube tunnel, comparison and selection

Keywords: immersed tube tunnel     scheme comparison     waterproof design     construction technology    

Study on construction technique of large section sub-sea tunnel crossing the weak stratum

Huang Mingli,Lu Wei,Xu Hengguo,Tan Zhongsheng

Strategic Study of CAE 2009, Volume 11, Issue 7,   Pages 35-38

Abstract:

Xiang'an sub-sea tunnel is the first large section sub-sea tunnelstabilizing capacity of the surrounding rocks, water inrush is the maximal risk during the sub-sea tunnelconstruction.In this paper, based on analyzing the excavation method of the tunnel and results of on site monitoringwhen crossing the weak stratum with abundant water, and offer technological support for construction

Keywords: Xiamen Xiang’an sub-sea tunnel     weak stratum     construction technique    

Discussion on construction ventilation program of Bohai Strait tunnel

Wu Yuanjin,Zou Chong

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 90-94

Abstract:

The tunneling length of single face of Bohai Strait tunnel increasesThe construction ventilation of Bohai Strait tunnel is studied in terms of ventilation mode selection, the gallery-type ventilation method is proposed to solve the ventilation problem of the mentioned tunnelThe paper can provide ventilation technical support to the study on Bohai Strait tunnel.

Keywords: Bohai Strait tunnel     construction ventilation     gallery-type ventilation     program design    

Information construction of the subsea tunnel in a fault and crush zone

Yang Huijun,Wang Mengshu,Zhuo Yue,Luo Song

Strategic Study of CAE 2012, Volume 14, Issue 10,   Pages 57-64

Abstract:

The construction of the excavation and support of the subsea tunnel isRelying on the construction of a fault and crush zone of the second subsea tunnel inland, using the methodconvergence, subsidence of crown, and pressure of surrounding rock, by processing of data, and to the construction, is called the information construction of the subsea tunnel in a fault and crush zone.The method is applied to the construction, produces a satisfactory effect.

Keywords: a fault and crush zone of subsea tunnel     comprehensive pre geology prediction     full sectional grouting     information construction    

Study on shaft drilling and blasting construction risk analysis and countermeasures of Bohai Strait tunnel

Zhang Wenxin and Zou Chong

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 101-106

Abstract:

In view of the shaft construction risk analysis of Bohai Strait tunnel, this paper determines risks during construction.Considering the influences of key risk and other risks on the shaft construction,we put forward responsemeasures about shaft construction risk of Bohai Stiait tunnel from the geological forecast,shaft hoisting,which provide guidance for the subsequent construction.

Keywords: strait tunnel     shaft construction     drilling and blasting method     risk analysis     response measures    

Title Author Date Type Operation

Large-scale model test study on the water pressure resistance of construction joints of karst tunnel

Journal Article

Construction risks of Huaying mount tunnel and countermeasures

Haibo YAO, Feng GAO, Shigang YU, Wei DANG

Journal Article

Design and construction technology of underwater tunnel

Wang Mengshu

Journal Article

Construction technology of Wuhan Changjiang tunnel―the first tunnel under Changjiang River

Wang Mengshu,Sun Mou,Tan Zhongsheng

Journal Article

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnelconstruction big data

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Journal Article

Experiences and Lessons From the Construction of Erlang Shan Tunnel

Zheng Daofang

Journal Article

The location choice and construction technology of shafts in Bohai Strait tunnel

Wang Yunlong,Tan Zhongsheng

Journal Article

Research on construction optimization of asymmetric double arch section in Jiaozhou Bay Subsea Tunnel

Wang Kai,Zhang Chengping,Wang Mengshu

Journal Article

Grouting construction technology of high pressure and rich water fault F11 in Qiyueshan Tunnel

Zhuo Yue,Sun Guoqing

Journal Article

Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel

Qu Shouxin

Journal Article

Key technology of design and construction on immersed tube tunnel

Du Chaowei,Wang Xiuying

Journal Article

Study on construction technique of large section sub-sea tunnel crossing the weak stratum

Huang Mingli,Lu Wei,Xu Hengguo,Tan Zhongsheng

Journal Article

Discussion on construction ventilation program of Bohai Strait tunnel

Wu Yuanjin,Zou Chong

Journal Article

Information construction of the subsea tunnel in a fault and crush zone

Yang Huijun,Wang Mengshu,Zhuo Yue,Luo Song

Journal Article

Study on shaft drilling and blasting construction risk analysis and countermeasures of Bohai Strait tunnel

Zhang Wenxin and Zou Chong

Journal Article