1. Introduction
2. Study area
3. Data
Table 1 Details of the raw data used for modeling. |
Data | Location | Period of record | Organization | Primary use |
---|---|---|---|---|
STRM DEM | 82°1′52.439″ E 26°2′7.842″ N to 83°55′10.63″ E 24°22′53.034″ N | — | USGS | Watershed delineation |
Satellite imagery (Landsat 8) | 82°1′52.439″ E 26°2′7.842″ N to 83°55′10.63″ E 24°22′53.034″ N | November 2014 | USGS | To create LULC map and model input |
Soil data | Uttar Pradesh | — | NBSSLUP | To create soil map and model input |
Climate data | Varanasi, Balia, Babatpur, and Gazipur | 1996–2015 | IMD Pune | Model input |
4. Methods and procedures
4.1. Soil and Water Assessment Tool (SWAT)
4.2. Sequential uncertainty fitting version 2 (SUFI-2)
4.3. Generalized likelihood uncertainty estimation (GLUE)
4.4. Parallel solution (ParaSol)
4.5. Data pre-processing
Table 2 Details of user soil table. |
SNAM (Soil properties) | Soil classes | |||||
---|---|---|---|---|---|---|
Rc1-2a-194 | Re59-2b-244 | Vc7-3a-279 | Xh14-1a-300 | Xh14-ab-303 | ||
General | S5ID | IND194 | IND244 | IND279 | IND300 | IND303 |
HYDGRP (hydrological soil group)a | D | C | D | C | C | |
TEXTUREb | L | L | CL | SCL | SL | |
Layer 1 | SOL_Z1 (depth of soil in mm) | 300 | 300 | 300 | 300 | 300 |
SOL_BD1 (bulk density in gm·mL−1) | 1.5079 | 1.5583 | 1.5043 | 1.5847 | 1.5952 | |
SOL_AWC1 (available water capacity in mm H2O per mm soil) | 0.1441 | 0.1192 | 0.1327 | 0.0984 | 0.0893 | |
SOL_K1 (hydraulic conductivity in mm·h−1) | 4.1604 | 9.7772 | 4.0563 | 12.9805 | 30.1535 | |
SOL_CBN1 (carbon content in percentage of soil weight) | 0.6% | 0.8% | 0.8% | 0.7% | 0.6% | |
CLAY1 (percentage of clay) | 28% | 22% | 30% | 21% | 13% | |
SILT1 (percentage of silt) | 43% | 31% | 34% | 21% | 23% | |
SAND1 (percentage of sand) | 30% | 47% | 36% | 58% | 64% | |
SOL_ALB1 (soil albedo)c | 0.3971 | 0.346 | 0.346 | 0.3707 | 0.3971 | |
USLE_K1 (USLE erodibility factor) | 0.1719 | 0.163 | 0.1589 | 0.1569 | 0.1687 | |
Layer 2 | SOL_BD2 (bulk density in gm·mL−1) | 1.535 | 1.5561 | 1.4814 | 1.5972 | 1.6026 |
SOL_AWC2 (available water capacity n mm H2O per mm soil) | 0.1202 | 0.1158 | 0.1387 | 0.0957 | 0.0914 | |
SOL_K2 (hydraulic conductivity in mm·h−1) | 3.6147 | 10.3717 | 2.4191 | 12.8314 | 21.7927 | |
SOL_CBN2 (carbon content in percentage of soil weight) | 0.5% | 0.9% | 0.4% | 0.5% | 0.5% | |
CLAY2 (percentage of clay) | 31% | 22% | 34% | 21% | 16% | |
SILT2 (percentage of silt) | 26% | 28% | 36% | 20% | 22% | |
SAND2 (percentage of sand) | 43% | 49% | 29% | 59% | 62% | |
SOL_ALB2 (soil albedo) | 0.4254 | 0.323 | 0.4557 | 0.4254 | 0.4254 | |
USLE_K2 (USLE erodibility factor) | 0.1561 | 0.158 | 0.1647 | 0.1583 | 0.1658 |
4.6. SWAT modeling
4.7. Calibration and validation
Table 3 Parameters used for calibration, with their absolute ranges. |
Parameters | Description | Minimum | Maximum |
---|---|---|---|
GW_DELAY | Groundwater delay (d) | 0 | 500 |
OV_N | Manning’s n value for overland flow | 0.01 | 30 |
SOL_K | Saturated hydraulic conductivity | 0 | 2000 |
ALPHA_BF | Base flow alpha factor | 0 | 1 |
CH_N2 | Manning’s n value for the main channel | −0.01 | 0.3 |
CH_K2 | Effective hydraulic conductivity in main channel alluvium | −0.01 | 500 |
CN2 | SCS runoff curve number f | 35 | 98 |
USLE_P | USLE equation support parameter | 0 | 1 |
SOL_AWC | Available water capacity of the soil layer | 0 | 1 |
SURLAG | Surface runoff lag time | 0.05 | 24 |
USLE_K | USLE equation soil erodibility (K) factor | 0 | 0.65 |
4.8. Methodology and criteria for comparison
5. Results
5.1. SWAT output
Table 4 Average monthly values of the parameters for the watershed. |
Month | Rainfall (mm) | Snowfall (mm) | SUR Q (mm) | Lateral Q (mm) | Water yield (mm) | ET (mm) | SED (t·hm−2) | PET (mm) |
---|---|---|---|---|---|---|---|---|
Jan | 16.30 | 0 | 3.11 | 0.03 | 4.29 | 13.75 | 0.08 | 84.90 |
Feb | 15.60 | 0 | 2.07 | 0.03 | 2.77 | 16.56 | 0.05 | 94.98 |
Mar | 4.09 | 0 | 0.40 | 0.02 | 0.91 | 42.98 | 0.01 | 186.43 |
Apr | 5.14 | 0 | 0.38 | 0.02 | 0.67 | 27.98 | 0.01 | 211.08 |
May | 13.41 | 0 | 0.97 | 0.02 | 1.17 | 16.06 | 0.01 | 214.76 |
Jun | 107.36 | 0 | 22.41 | 0.05 | 19.80 | 34.62 | 0.29 | 190.49 |
Jul | 255.36 | 0 | 103.17 | 0.21 | 103.50 | 68.92 | 1.18 | 134.00 |
Aug | 274.62 | 0 | 115.85 | 0.32 | 136.90 | 72.31 | 2.11 | 122.88 |
Sep | 201.68 | 0 | 94.99 | 0.34 | 145.24 | 59.26 | 2.14 | 123.88 |
Oct | 28.68 | 0 | 9.61 | 0.20 | 56.11 | 32.92 | 0.19 | 151.62 |
Nov | 8.89 | 0 | 2.33 | 0.10 | 25.71 | 15.84 | 0.07 | 121.75 |
Dec | 10.00 | 0 | 3.26 | 0.06 | 10.09 | 10.35 | 0.06 | 90.63 |
Table 5 Average annual values of the parameters for each land type. |
LULC type | Area (km2) | CN | AWC (mm) | USLE_LS | Precipitation (mm) | SUR Q (mm) | GW Q (mm) | ET (mm) | SED (t·hm−2) |
---|---|---|---|---|---|---|---|---|---|
WATR | 414.83 | 92.00 | 104.91 | 0.67 | 938.86 | 0 | 0 | 1374.49 | 0 |
URBN | 5683.33 | 83.21 | 102.13 | 0.18 | 917.93 | 422.43 | 84.19 | 370.26 | 3.45 |
RNGE | 5233.71 | 80.43 | 103.27 | 0.26 | 936.31 | 294.35 | 200.57 | 393.79 | 4.71 |
AGRL | 1071.01 | 84.28 | 105.53 | 0.48 | 959.55 | 360.58 | 164.57 | 388.93 | 11.92 |
BARR | 1268.02 | 92.10 | 106.89 | 0.31 | 947.23 | 556.68 | 33.29 | 327.52 | 29.27 |
FRSD | 1948.26 | 80.64 | 118.56 | 0.98 | 1008.96 | 291.12 | 226.44 | 442.55 | 1.38 |
5.2. Comparison output
Table 6 Comparison of calibration algorithms, according to the criteria given in Section 4.8. |
Category | Criteria | GLUE | Parasol | SUFI-2 |
---|---|---|---|---|
1a | GW_DELAY | 160.08 (9.52, 279.29) | 108.70 (92.23, 114.20) | 191.07 (100.04, 300.00) |
SOL_K | 0.16 (0.36, 0.78) | 0.37 (0.41, 0.34) | 0.10 (0.58, 0.34) | |
ALPHA_BF | 0.12 (0.06, 0.97) | 0.12 (0.08, 0.13) | 0.51 (0.23, 0.74) | |
OV_N | 0.05 (0.00, 0.20) | 0.11 (0.07, 0.10) | 0.06 (0.00, 0.11) | |
CH_N2 | 0.30 (−0.01, 0.30) | 0.20 (0, 0.30) | 0.20 (0, 0.30) | |
CH_K2 | 78.19 (6.01, 144.82) | 35.70 (27.72, 37.67) | 83.95 (69.42, 150.00) | |
CN2 | 17.68 (28.85, 8.90) | 21.17 (20.93, 20.08) | 27.00 (29.00, 7.23) | |
USLE_P | 0.40 (0, 1) | 0.50 (0, 1) | 0.30 (0, 1) | |
SOL_AWC | 0.11 (0.01, 0.15) | 0.07 (0.08, 0.08) | 0.07 (0.05, 0.15) | |
SURLAG | 2.00 (0.05, 24) | 3.20 (2.00, 20) | 2.00 (0.05, 23) | |
USLE_K | 0.17 (0.01, 0.64) | 0.19 (0.07, 0.60) | 0.17 (0.01, 0.63) | |
Parameter correlations | Yes | Yes | No | |
2b | NSE | 0.76 | 0.77 | 0.76 |
R2 | 0.77 | 0.66 | 0.78 | |
bR2 | 0.63 | 0.62 | 0.62 | |
3 | P-factor | 0.76 | 0.18 | 0.79 |
4c | Source of parameter uncertainty | All sources | Parameter only | All sources |
Conceptual basis of parameter uncertainty | i. Normalization of generalized likelihood measure | i. Least squares (probability theory) | i Generalized objective function | |
Testability of statistical assumption | No | Yes | Yes | |
5 | Difficulty of implementation | Very easy | Easy | Easy |
5.3. SUFI-2 output
Table 7 Objective function values. |
Method | P-factor | R-factor | R2 | NSE | bR2 | PBIAS | KGE | RSR |
---|---|---|---|---|---|---|---|---|
SUFI-2 | 0.69 | 0.763 | 0.78 | 0.76 | 0.621 | 2.4 × 102 | 0.82 | 0.49 |