正文
《机械工程前沿(英文)》 >> 2006年 第1卷 第4期 doi: 10.1007/s11465-006-0064-5
Forecast method for used number of parts and components based on complex network
1.Department of Electronic Machinery and Transportation Engineering, Guilin University of Electronic Technology, Guilin 541004, China; 2.Institute of Contemporary Manufacturing Engineering, Zhejiang University, Hangzhou 310027, China;
摘要
关键词
complex network ; industrial ; component ; analytic expression ; forecast
正文