期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《中国工程科学》 >> 2005年 第7卷 第11期

民航视情维修决策优化模型发展

南京航空航天大学民航学院,南京 210016

收稿日期: 2004-12-03 修回日期: 2005-03-31 发布日期: 2005-11-20

下一篇 上一篇

摘要

目前视情维修是民航业采用的主要维修方式,可以使维修的有效性、经济性大幅度提高。维修决策优化模型对民航维修成本的降低和利润的提升具有显著的指导作用;归纳了视情维修的时间延迟模型、冲击模型、比例危险模型、马尔可夫决策模型等优化模型的建模方法;分析了该类模型在应用中存在的不足,并展望了其发展前景。

图片

图1

图2

参考文献

[ 1 ] 费雷斯特.帕德, 王秩信.可靠性维修基本原理———工业管理的未来[J].莽克论译.设备管理与维修, 1994, (2) :33~35 链接1

[ 2 ] Christer A H, Waller W M.Delay time model ofindustrial inspection maintenance problems[J].J OplRes Soc, 1984, 35:401~406

[ 3 ] Christer A H, Wang W.A Model of conditionmonitoring of a production plant[J].J Prod Res, 1992, 30 (9) :2199~2211

[ 4 ] Scarf P A.On the application of mathematical modelsin maintenance[J].European Journal of OperationalResearch, 1997, 99 (3) :493~506

[ 5 ] Baker R D, Scarf P A, Wang W.A delay-time modelfor repairable machinery:maximum likelihoodestimation of optimum inspection intervals[J].Journalof Mathematics Applied in Business and Industry, 1997, 8 (1) :83~92

[ 6 ] Christer A H, Wang W.A simple Conditonmonitoring model for a direct monitoring process[J].European Journal of Operational Research, 1995, 82 (2) :258~269

[ 7 ] Yang K, Jeang A.Statistical surface roughness checkingprocedure based on a cutting tool wear model[J].Journal ofManufacturing System, 1994, 13 (1) :1~8

[ 8 ] Wang W.A model to determine the optimal criticallevel and the monitoring intervals in condition-basedmaintenance[J].J Prod Res, 2000, 38 (6) :1425~1436

[ 9 ] Coolen F P A, Dekker R.Analysis of a 2-phase model foroptimization of condition monitoring intervals[J].IEEETransactions on Reliability, 1995, 44 (3) :505~511

[10] Coolen F P A, Pcoolen-Schrijner, Yan K J.Noparametric predictive inference in eliability[J].Reliability Engineering and System Safety, 2002, 78 (2) :185~193

[11] Barbera F, Schneider H, Kelle P.A condition basedmaintenance model with exponential failures and fixedinspection intervals[J].Journal of the OperationalResearch Society, 1996, 47:1037~1045

[12] Taylor H M.Optimal replacement under additivedamage and other failure models[J].Naval ResearchLogistics, 1975, 22:1~18

[13] Feldman R M.Optimal replacement with semi-markovshock models using discounted costs[J].Maths OpnsRes, 1977, (2) :78~90

[14] Nummelin E.A general failure model:optimalreplacement with state dependent replacement andfailure costs[J].Math Opns Res, 1980, (5) :381~387

[15] Aven T, Gaarder S.Optimal replacement in a shock model:discrete time[J].J App Prob, 1987, 24:281~287

[16] Gottlieb G.Optimal replacement for shock models withgeneral failure rate[J].Opens Res, 1982, 30:82~92

[17] Gottlieb G, Levikson B.Optimal replacement for self-repairing shock model with general failure rate[J].JApp Prob, 1984, 21:108~119

[18] Prentice R L, Kalbfleisch J D.Hazard rate models withcovariates[J].Biometrics, 1979, 35:25~39

[19] Kumar D, Westberg U.Maintenance scheduling under agereplacement policy using proportional hazards modelling andtotao-time-on-test plotting[J].European Journal ofOperational Research, 1997, 99:507~515

[20] Love C E, Guo R.Using proportional hazard modellingin plant maintenance[J].Quality and ReliabilityEngineering International, 1991, (7) :7~17

[21] Makis V, Jardine A K S.Optimal replacement in theproportional hazards model[J].INFOR, 1991, 30:172~183

[22] Kalbfleisch J D, Prentice R L.The Statistical analysisof failure time data[M], ed.Wiley, New York, 1980

[23] Ascher H E, Kobbacy K A H.Modelling preventivemaintenance for deteriorating repairable systems[J].Journal of Mathematics Applied in Business andIndustry, 1995, (6) :85~100

[24] Wald A.Statistical Decision Fuctions[M], secondedition, Chelsea, New York, 1971

[25] Howard R.Dynamic Programming and MarkoveDecision Process[M], Cambridge:MIT Press, 1960

[26] Howard R.Semi-markovian decision processes[A].Proceedings 34th Session International Statistics[C].Ottawa, Canada.1963

[27] Jewell W S.Markov-renewas programming 1:formulation, finite-return models.2:infinite return models, examples[J].Opens Res, 1963, (11) :938~971

[28] Jia Y, Wang W.A development of a condition basedmaintenance model and its prototype software[A].The 5th International Conference on Reliability[C].Maintainability and Safety.2001.Dalian

[29] Wang W, Christer A H.Toward a general condition basedmaintenance model for a stochastic system[J].Journal ofthe Operational Research Society, 2000, 51:145~155

[30] Grall A, Dieulle L, Berenguer C, et al.Contiuous-timepredictive-maintenance scheduling for a deterioratingsystem[J].IEEE Transactions on Reliability, 2002, 51 (2) :141~150

[31] Dieulle L, Berenguer C, Grall A, et al.Sequentialcondition-based maintenance scheduling for adeteriorating system[J].European Journal ofOperational Research, 2003, 150 (2) :451~461

[32] Rommert D, et al.Applications of maintenanceoptimization models:a review and analysis[J].Reliability Engineering&System Safety, 1996, 51 (3) :229~240

相关研究