期刊首页 优先出版 当期阅读 过刊浏览 作者中心 关于期刊 English

《中国工程科学》 >> 2011年 第13卷 第9期

风电项目中的土木工程问题及有关研究的思考和发展展望

1. 天津城建学院土木工程系,天津 300384;

2. 清华大学土木水利学院,北京 100084

收稿日期: 2011-05-23 发布日期: 2011-09-15 10:02:05.000

下一篇 上一篇

摘要

从配套工程建设、风况数据的搜集、整理及分析、预测等角度,探讨了促进我国风电事业的发展方式;指出关注风电建设中的土木工程问题,编制有关规范或指导手册等文件,做好风资源的普查、评估和风电场发电量预测,并在这些技术领域做到专业化、规范化,形成可靠的、成熟的、具有自主知识产权的技术体系对我国的风电发展至关重要。最后探讨了需要进行研究的方向,并结合中国国情对风电的发展做了展望。

图片

图1

图2

图3

图4

图5

参考文献

[ 1 ] Global wind energy council.A blueprint to achieve world ’ s 12 % electricity from wind power by 2020 [R ].Washington D.C.: Global Wind Energy Council,2005.

[ 2 ] 111 th United States Congress.American Recovery and Reinvest‐ ment Act of 2009 [M ].Washington D.C.:Global Wind Energy Council,2009.

[ 3 ] Fontes A F.Soil albedo in relation to soil color,moisture and roughness[D].USA:the University of Arizona,1996.

[ 4 ] Renewable energy system ‐Americas [R ].USA:Internal Docu‐ ment,2006.

[ 5 ] ACI Committee 318.Building code requirements for structural con‐ crete (ACI 318 -05 )and commentary (ACI 318R -05 )[S]. USA,2005.

[ 6 ] Wang D.Ground modulus measurement and interpretation for wind turbine foundations [C ]//Proc.17 th International Conference of Soil Mechanics and Geotechnical Engineering,Egypt,2009.

[ 7 ] Ris矱national laboratory.Guidelines for design of wind turbines [S].Denmark,2003.

[ 8 ] Bonnet D.Wind turbine foundations – loading,dynamics and de‐ sign,presented to evening meeting [C ]//17 February 2005 at IStructE.London:11 Upper Belgrave Street,2005.

[ 9 ] 张超然,李 婧,刘 星.海上 风电场 建设 重大 问题 探讨 [J]. 中国工程科学,2010,12(11):10 -15.

[10] National Goperative Highway Research Program.Design of pave‐ ment structures[S].USA:AASHTO,1993.

[11] Peterka J,Shihad S. Design gust wind speeds in the United States [J].Journal of Structural Engineering,1998 ,124(2): 207 -214.

[12] International Electrotechnical Commission.Wind turbine generator systems – part 1:safety requirements[S].

[13] Eurocode 2:design of concrete structures[S].DD ENV 1992 - 1 -1:1992.

[14] British standard 8110 -1997 and 1985 [S].

[15] Règles BAEL 91 révisées 99,février 2000 [S].DTU P 18 - 702.

[16] 中 华 人 民 共 和 国 建 设 部.建 筑 结 构 荷 载 规 范,GB50009 - 2001[S].北京:中国建筑工业出版社,2006.

[17] 王晓蓉,王伟胜,戴慧珠.我 国 风 力 发 电 现 状 和 展 望 [J].中 国电力,2004,37(1):81 -84.

[18] 于建辉,周 浩.我国风力 发 电 现 状 及 展 望 [J].风 电 技 术, 2006,6:46 -50.

[19] 张新房,徐大平,吕跃刚,等.风 力 发 电 技 术 的 发 展 及 若 干 问 题[J].现代电力,2003,20(5):29 -34.

[20] Sempreviva A M,Barthelmie R J,Pryor S C.Review of method‐ ologies for offshore wind resource assessment in european seas [J].Surveys in Geophysics,2008,29(6):471 -497.

[21] Yan D,Kozai K.Literature review on evaluation methods of off‐ shore wind energy resources in China[R].Japan:Kobe Univer‐ sity,2011.

[22] Pimenta F,Kempton W,Garvine R.Combining metrological sta‐ tions and satellite data to evaluate offshore wind power resources in Southeastern Brazil[J].Renewable Energy,2008,33(11): 2375 -2387.

[23] Christensen M B,Koch W,Horstman J,et al.Wind resources assessment from C -band SAR[J].Remote Sensing of Environ‐ ment,2006,105(1):15.

[24] Quilfen Y,Chapron B.The ERS scatterometer wind measure‐ ment accuracy:evidence of seasonal and regional biases [J]. Journal of Atmospheric and Ocean Technology,2001,18 (10): 1684 -1697.

[25] Sempreviva A M,Barthelmie R,Giebel G,et al.Offshore wind resource assessment in european seas[J].Surveys in Geophys‐ ics,2007,29(6):471 -497.

[26] Christophe A,Stefano Z,Alfredo L,et al.Comparison of 10 -M wind forecasts from a regional area model and quikscatscatterome‐ ter wind observations over the mediterranean sea [J].Monthly Weather Review,2007,135(5):1945 -1959.

[27] Lehner S,Horstmann J,Koch W,et al.Mesoscale wind meas‐ urements using recalibrated ERS SAR Images [J].Journal of Ge‐ ophysical Research,1998,103(C4):7847 -7856.

[28] Petersen E L,Mortensen N G,Landberg L,et al.Wind power meteorology,part I:climate and turbulence [J].Wind Energy, 1998,1(1):2 -22.

[29] Petersen E L,Mortensen N G,Landberg L,et al.Wind power meteorology. part II:siting and models [J ]. Wind Energy, 1998,1(1):55 -72.

[30] 李泽 椿,朱 蓉,何 晓 凤,等.风 能 资 源 评 估 技 术 方 法 研 究 [J].气象学报,2007,65(5):708 -717.

[31] Shikha Singh,Bhatti T S,Kothari,et al.A review of wind re‐ source assessment technology [J].Journal of Energy Engineer‐ ing,2006,132(1):8 -14.

[32] Justus C G,Mikhail A.Height variation of wind speed and wind distributions statistics[J].Geophysical Research Letters,1976, 3(5):261 -264.

[33] Johnson G L.Wind Energy System [M].USA:Electronic Ver‐ sion,2006.

[34] Bossanyi E A.Short‐term stochastic wind prediction and possible control applications [C ]//Proceedings Delphi Workshop on Wind Energy Applications.USA:Pacific Northwest Labs,1985.

[35] Kariniotakis G,Nogaret E,Stavrakakis G.Advanced short‐term forecasting of wind power production[R].Ireland:Proceedings European Wind Energy Conference,1997.

[36] Nielsen T L,Madsen H.Experiences with statistical methods for wind power prediction [R ].France: European Wind Energy Conference,1999.

[37] Badger M.Satellite SAR wind resource mapping in China[S]. Roskilde:Ris矱National Laboratory for Sustainable Energy Tech‐ nical University of Denmark,2009.

[38] 余 志,李晓燕,邓院昌.建立基于 Web GIS 的风 资源分 析与 评估系统[C]//第十 四 届 水 动 力 学 研 讨 会 文 集.北 京:海 洋 出版社,2004.

[39] Elliott D,Schwartz M,Scott G,et al.Wind resources assessment and mapping [S].American:NREL /NWTC,2007.

相关研究