正文
《工程管理前沿(英文)》 >> 2020年 第7卷 第1期 doi: 10.1007/s42524-019-0041-4
Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making
. UMR n°3495 MAP-CRAI Mixed Research Unit Models and Simulations for Architecture and Heritage-Research Centre in Architecture and Engineering, Nancy 54000, France; CNRS—The National Centre for Scientific Research, Paris 75794, France.. LIST—Luxembourg Institute of Science and Technology, Esch-sur-Alzette L-4362, Luxemburg.. UMR n°3495 MAP-CRAI Mixed Research Unit Models and Simulations for Architecture and Heritage-Research Centre in Architecture and Engineering, Nancy 54000, France; University of Lorraine, Nancy 54000, France
摘要
关键词
BIM ; 4D BIM ; 4D BIM use ; AEC project management ; collaboration ; decision making
正文