资源类型

期刊论文 92

会议视频 3

年份

2023 4

2022 5

2021 14

2020 8

2019 8

2018 3

2017 8

2016 6

2015 4

2014 3

2013 2

2012 4

2011 1

2010 2

2008 2

2007 5

2006 3

2005 4

2004 2

2003 1

展开 ︾

关键词

实施路径 2

工程管理 2

扫描格式转换 2

桥梁 2

生态文明建设 2

系统集成 2

结构监测系统 2

运动补偿 2

高质量发展 2

COVID-19 1

GPU;密度峰值;聚类;并行计算 1

HY-2 卫星地面应用系统 1

S-57 1

SEIR+Q传染病动力学模型 1

TGPMS 1

WAPI 1

“一带一路” 1

三峡库区 1

业务运行模型 1

展开 ︾

检索范围:

排序: 展示方式:

Twenty years of achievements in China’s implementation of the Stockholm Convention

《环境科学与工程前沿(英文)》 2022年 第16卷 第12期 doi: 10.1007/s11783-022-1587-7

摘要:

● China’s implementation of the SC was systematically studied.

关键词: Stockholm Convention     Persistent organic pollutants     Compliance     Effectiveness    

Understanding barriers to BIM implementation: Their impact across organizational levels in relation to

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

《工程管理前沿(英文)》 2021年 第8卷 第2期   页码 236-257 doi: 10.1007/s42524-019-0088-2

摘要: This multiple case study of a contracting firm contributes to understanding the barriers that organizations face during the implementation of building information modeling (BIM) by providing insights into the impact of these barriers across different organizational levels (i.e., from top management to project teams) and by relating these barriers to different degrees of BIM maturity. First, we observe the dominance of barriers related to the motivation, competence, and time capacity of people across all levels of an organization. Second, the cluster of barriers at the middle-management level highlights the important role of this level in reducing these barriers. Third, only those cases with a low level of BIM maturity have struggled with lack of top management support, thereby highlighting the importance of such support in achieving BIM maturity growth. High BIM maturity situations are more prone to externally oriented barriers in attempting to further leverage the benefits of BIM. Our study provides insights on where to focus BIM implementation measures and how to enhance organizational BIM maturity.

关键词: building information modeling     implementation barriers     maturity     organizational levels    

Overview and problems of BIM implementation in Japan

Takashi KANETA, Shuzo FURUSAKA, Nisi DENG

《工程管理前沿(英文)》 2017年 第4卷 第2期   页码 146-155 doi: 10.15302/J-FEM-2017007

摘要: This paper aims to overview Building Information Modeling (BIM) implementation and problems of BIM implementation in Japan. First, BIM implementation guidelines and pilot projects are introduced. Then, some popular BIM software together with typical implementation cases are provided. BIM implementation in Japan is not always encouraged via a top-down consensus in architectural firms and general contractors, as the client and architects can reduce the project risk inherent in design and drawings by transferring these tasks to a general contractor. The paper finally discusses the problems in project management to present a strategy to develop a new version of BIM that will provide value to all of the stakeholders of a project.

关键词: Building Information Modeling     general contractor     architect     drawing     procurement     project management    

Thoughts on strategies and paths to achieve carbon peaking and carbon neutrality in China

《能源前沿(英文)》 2023年 第17卷 第3期   页码 324-331 doi: 10.1007/s11708-023-0883-7

摘要: First, a brief introduction is made to the four basic judgments and understandings of the goals of “carbon peaking and carbon neutrality.” Then, an in-depth elaboration is provided on the eight major strategies for achieving the goals of “carbon peaking and carbon neutrality,” including conservation and efficiency priority, energy security, non-fossil energy substitution, re-electrification, resource recycling, carbon sequestration, digitalization and cooperation between countries. Next, eight major implementation paths for achieving the goals of “carbon peaking and carbon neutrality” are discussed in detail, including industrial restructuring; building a clean, low-carbon, safe and efficient energy system, and renewing the understanding of China’s energy resource endowment; accelerating the construction of a new-type power system with a gradually growing proportion of new energy, and realizing the “possible triangle” of high-quality energy system development; utilizing electrification and deep decarbonization technologies to promote the orderly peaking and gradual neutralization of carbon emissions in the industrial sector; promoting the low-carbon transition of transportation vehicles to achieve carbon peaking and carbon neutrality in the transportation sector; focusing on breaking through key green building technologies to achieve zero carbon emissions from building electricity and heat; providing a strong technical support for carbon removal to achieve carbon neutrality; accelerating the construction of the integrated planning and assessment mechanism for pollution and carbon reduction, establishing a sound strategy, planning, policy and action system, and optimizing the carbon trading system. Afterwards, it is particularly pointed out that the realization of the goals of “carbon peaking and carbon neutrality” cannot be separated from the support of sci-tech innovation. Finally, it is stressed that carbon neutrality is not the end, but an important milestone. If viewed from the perspective of future energy, the significance and historical status of the goals of “carbon peaking and carbon neutrality” will be more understandable.

关键词: carbon peaking and carbon neutrality     strategy     implementation path     important sci-tech innovation implementation path    

Quality Function Deployment Implementation in Construction: A Systematic Literature Review

Elizabeth A. Cudney,William L. Gillis

《工程管理前沿(英文)》 2016年 第3卷 第3期   页码 224-230 doi: 10.15302/J-FEM-2016036

摘要: The construction of new buildings represents a significant investment. The goal of new building construction is to maximize value and minimize cost while staying on time and within budget. Translating customer requirements into engineering terms for new construction design is vital for a construction project to be successful. Quality function deployment has been successfully used in product development to capture the voice of the customer and translate it into engineering characteristics. Quality function deployment then carries these parameters into production and service to ensure the voice of the customer is being met with the final product. The house of quality, a tool within quality function deployment, can provide a means for comparison of owner’s project requirements and the proposed design, along with identifying how the design decisions impact meeting customer requirements and green building requirements. Quality function deployment can effectively link the project phases through design and construction and into operations and maintenance to ensure the owner’s project requirements are met with the final building. This research identifies and categorizes studies of quality function deployment applications in construction. The research method used is a systematic literature review from databases related to quality function deployment in the construction industry published in the periodicals through 2016. The principal findings of implementations, practices, and integrated approaches are then summarized. This article intends to propel further research of quality function deployment in the construction sector.

关键词: construction     engineering management     quality function deployment     systematic review    

Research and implementation of flexible coding system oriented multi-view

ZHANG Xuhui, ZHANG Xu, NING Ruxin

《机械工程前沿(英文)》 2007年 第2卷 第4期   页码 448-452 doi: 10.1007/s11465-007-0077-8

摘要: On the basis of the requirements of a product data management system (PDM) for the flexible coding system, the principle of the flexible coding system oriented multi-view is analyzed. Generation and utilization of coding should be associated with the context of the object. The architecture of the flexible coding system oriented multi-view is studied and the implementation class diagram of the system is designed. The system can support the establishment of five types of code segments, provide the tools of flexible defining coding rules and drive the automatic generation of object coding in different views (contexts). On the foundation of the characteristics of the system, coding for parts is taken as a sample to validate and elaborate the flexible coding process of the system.

关键词: foundation     different     management     utilization     Generation    

Outcomes of patients awaiting lung transplantation after the implementation of donation after brain death

《医学前沿(英文)》 2022年 第16卷 第5期   页码 760-765 doi: 10.1007/s11684-021-0899-5

摘要: Voluntary contribution has become the only source of donor lungs in China since 2015. To elaborate the outcomes of patients awaiting lung transplantation (LTx) after the implementation of donation after brain death, we performed a retrospective study that encompassed 205 patients with end-stage lung disease who registered for LTx at Shanghai Pulmonary Hospital from January 1, 2015 to January 1, 2021. A total of 180 patients were enrolled in the study. The median waiting time was 1.25 months. Interstitial lung disease (ILD) (103/180, 57.2%) and chronic obstructive pulmonary disease (COPD) (56/180, 31.1%) were the most common diseases in our study population. The mean pulmonary artery pressure (mPAP) of patients in the died-waiting group was higher than that of the survivors (53.29±21.71 mmHg vs. 42.11±18.58 mmHg, P=0.002). The mortality of patients with ILD (34/103, 33.00%) was nearly twice that of patients with COPD (10/56, 17.86%) while awaiting LTx (P=0.041). In the died-waiting group, patients with ILD had a shorter median waiting time than patients with COPD after being listed (0.865 months vs. 4.720 months, P=0.030). ILD as primary disease and mPAP > 35 mmHg were two significant independent risk factors for waitlist mortality, with hazard ratios (HR) of 3.483 (95% CI 1.311–9.111; P=0.011) and 3.500 (95% CI 1.435–8.536; P=0.006). Hence, LTx is more urgently needed in patients with ILD and pulmonary hypertension.

关键词: lung transplantation     donation after brain death     waitlist    

大气探测系统设计和工程建设

郑国光

《中国工程科学》 2000年 第2卷 第6期   页码 21-26

摘要:

文章分析了我国大气探测业务现状和大气探测技术发展趋势,阐述了我国大气探测系统设计和工程建设的基本思路和目标,介绍了即将开始建设的国家大中型建设项目——大气监测自动化系统的总体结构和建设的主要内容。文章也是对大气科学的工程化建设一文[1]的进一步阐述。

关键词: 大气探测     监测自动化     工程设计与建设    

New medical risks affecting obstetrics after implementation of the two-child policy in China

null

《医学前沿(英文)》 2017年 第11卷 第4期   页码 570-575 doi: 10.1007/s11684-017-0552-5

摘要:

China recently instituted a two-child policy in response to its aging population, declining workforce and demographic dividend, and the need to develop asocial economy. Additionally, women generally delay having a second child because of the overwhelming pressure in their lives. With the improvements in assisted fertility technologies in recent years, the number of elderly women attempting to bear children has increased. The quality of woman’s eggs and a man’s sperm declined dramatically with increasing age, leading to an increased risk of pregnancy-related complications among older women. Therefore, the types of fertility problems experienced by elderly females must be provided with considerable attention by obstetricians. This commentary article focuses on the medical problems faced by older second-child pregnant women. This work discusses their increased rates of infertility, spontaneous abortion, fetal malformation, gestational diabetes, cesarean section, placenta previa, postpartum hemorrhage, postpartum depression, and hypertensive disorders, which complicate pregnancy.

关键词: two-child policy     birth defects     cesarean delivery     placenta previa    

Concepts and implementation of strain-based criteria in design codes for steel structures

Reidar BJORHOVDE

《结构与土木工程前沿(英文)》 2012年 第6卷 第3期   页码 210-216 doi: 10.1007/s11709-012-0165-7

摘要: A uniaxial tension test is commonly used to determine the mechanical properties of steel, but it has no meaning for the response of the material in a structure. The test was developed as a consensus solution by producers, fabricators, designers and code writers, to have a standard by which similar materials could be compared to a common base. It does not represent the actual behavior of the steel in a structure, and was never intended to do so. To study the true behavior of the structure and how the material responds it would be better to determine the strains and deformations that will take place during actual service condition. Such characteristics reflect the real behavior, whether in the elastic or inelastic range. If stresses or forces are needed, these are easily determined by the value of the strain and the relevant material modulus, along with the type of cross section, whether elastic or inelastic. The paper addresses the properties of a range of structural steels, how these are incorporated into design standards and how the standards define deformation characteristics and demands for bolted and welded connections.

关键词: steel     stress-strain characteristics     tension test     strain design     actual behavior     improved design codes    

Frequency-controlable sine signal based on PWM and its implementation on FPGA

Lianzhen HUANG, Jiangang LI, Dongjun ZHANG

《机械工程前沿(英文)》 2012年 第7卷 第3期   页码 322-328 doi: 10.1007/s11465-012-0312-9

摘要:

A sine generation method that the different frequent sine signals can be generated by the different Pulse-Width Modulation (PWM) signals generated by Field-Programmable Gate Array (FPGA) through low-pass filter of fixed parameters was proposed. The method just takes a few FPGA resources and was proved feasible by the theory. The experiment results and theory analysis tally.

关键词: Pulse-Width Modulation (PWM)     Field-Programmable Gate Array (FPGA)     frequency controllable    

Integration of climate change considerations into environmental impact assessment — implementation, problems

I-Shin CHANG, Jing WU

《环境科学与工程前沿(英文)》 2013年 第7卷 第4期   页码 598-607 doi: 10.1007/s11783-013-0496-1

摘要: Climate change plays an important role in affecting and altering the course of human development. So far, there have been no effective and efficient techniques to directly quantify the influences of climate change on human development, but there have been rough estimation and qualitative description of the effects. Since the 1990s, climate change considerations have been required to be included in environmental impact assessment, which is a flexible institutional framework of environmental risk evaluation and management. However, there have been no concrete achievements demonstrated. The purpose of this study was first to summarise the practical experience and to disclose the existing problems during the implementation of the process of integrating climate change considerations into environmental impact assessment in China through a case study. Currently in China, the practice of integrating climate change considerations into environmental impact assessment is mainly concentrated on the strategic environmental assessment level. The influences of climate change were identified as energy consumption, greenhouse gases emission, and the restraint of development under abnormal or extreme weather or climate conditions. Because of a lack of related technical guidelines and practical experience, the climate change considerations that have been selected and the evaluation methods that have been applied are quite different. Recommendations on policies, laws, and institutional regulations institution are proposed to better utilise environmental impact assessment to integrate climate change considerations into economic, social, and environmental decisions and actions.

关键词: climate change considerations     environmental impact assessment     energy consumption     greenhouse gases     low carbon    

A FEniCS implementation of the phase field method for quasi-static brittle fracture

HIRSHIKESH, Sundararajan NATARAJAN, Ratna Kumar ANNABATTULA

《结构与土木工程前沿(英文)》 2019年 第13卷 第2期   页码 380-396 doi: 10.1007/s11709-018-0471-9

摘要: In the recent years, the phase field method for simulating fracture problems has received considerable attention. This is due to the salient features of the method: 1) it can be incorporated into any conventional finite element software; 2) has a scalar damage variable is used to represent the discontinuous surface implicitly and 3) the crack initiation and subsequent propagation and branching are treated with less complexity. Within this framework, the linear momentum equations are coupled with the diffusion type equation, which describes the evolution of the damage variable. The coupled nonlinear system of partial differential equations are solved in a ‘staggered’ approach. The present work discusses the implementation of the phase field method for brittle fracture within the open-source finite element software, FEniCS. The FEniCS provides a framework for the automated solutions of the partial differential equations. The details of the implementation which forms the core of the analysis are presented. The implementation is validated by solving a few benchmark problems and comparing the results with the open literature.

关键词: phase field method     FEniCS     brittle fracture     crack propagation     variational theory of fracture    

Evaluation of automated in-line precision dairy farming technology implementation in three dairy farms

Maria CARIA, Giuseppe TODDE, Antonio PAZZONA

《农业科学与工程前沿(英文)》 2019年 第6卷 第2期   页码 181-187 doi: 10.15302/J-FASE-2019252

摘要:

In recent decades, dairy farms have been exposed to wide variation in profit levels due to a considerable variability of milk price, and energy and feed costs. Consequently, it is necessary for the dairy industry to improve efficiency and productivity by adopting innovative technologies. The automated in-parlour milk analysis and separation is mainly useful to produce low or high quality milk and to monitor the animal health status. Milk with high levels of protein and fat contents may reduce the intensity of standardization during cheesemaking process, reducing production costs. The study aimed to evaluate the efficiency of real-time milk separation during milking and the performance of the milking machine after implementation of AfiMilk MCS. In addition, the economic aspects were assessed. The separation of milk required the existing milking parlors to be equipped with an additional milkline to allow channeling milk with low and high coagulation properties into two different cooling tanks. The results showed that the high coagulation milk fraction, compared to the bulk milk, increased in fat (from 18% to 43%) and protein (from 3% to 7%) concentration. The technology tested has given promising results showing reliability and efficiency in milk separation in real time with affordable implementation costs.

关键词: cheese yield     infrared analysis     milk quality     real-time measurement     sensor    

Impacts of building information modeling (BIM) implementation on design and construction performance:

Dongping CAO, Heng LI, Guangbin WANG

《工程管理前沿(英文)》 2017年 第4卷 第1期   页码 20-34 doi: 10.15302/J-FEM-2017010

摘要: Drawing on resource dependence theory, this paper develops and empirically tests a model for understanding how the implementation of building information modeling (BIM) in construction projects impacts the performance of different project participating organizations through improving their interorganizational collaboration capabilities. Based on two sets of survey data collected from designers and general contractors in BIM-based construction projects in China, the results from partial least squares analysis and bootstrapping mediation test provide clear evidence that BIM-enabled capabilities of information sharing and collaborative decision-making as a whole play a significant role in determining BIM-enabled efficiency and effectiveness benefits for both designers and general contractors. The results further reveal that designers and general contractors benefit from project BIM implementation activities significantly non-equivalently, and that this non-equivalence closely relates to the different roles played by designers and general contractors in BIM-enabled interorganizational resource exchange processes. The findings validate the resource dependence theory perspective of BIM as a boundary spanning tool to manage interorganizational resource dependence in construction projects, and contribute to deepened understandings of how and why project participating organizations benefit differently from the implementation of interorganizational information technologies like BIM.

关键词: building information modeling     interorganizational collaboration     construction project performance     resource dependence theory     partial least squares modeling    

标题 作者 时间 类型 操作

Twenty years of achievements in China’s implementation of the Stockholm Convention

期刊论文

Understanding barriers to BIM implementation: Their impact across organizational levels in relation to

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

期刊论文

Overview and problems of BIM implementation in Japan

Takashi KANETA, Shuzo FURUSAKA, Nisi DENG

期刊论文

Thoughts on strategies and paths to achieve carbon peaking and carbon neutrality in China

期刊论文

Quality Function Deployment Implementation in Construction: A Systematic Literature Review

Elizabeth A. Cudney,William L. Gillis

期刊论文

Research and implementation of flexible coding system oriented multi-view

ZHANG Xuhui, ZHANG Xu, NING Ruxin

期刊论文

Outcomes of patients awaiting lung transplantation after the implementation of donation after brain death

期刊论文

大气探测系统设计和工程建设

郑国光

期刊论文

New medical risks affecting obstetrics after implementation of the two-child policy in China

null

期刊论文

Concepts and implementation of strain-based criteria in design codes for steel structures

Reidar BJORHOVDE

期刊论文

Frequency-controlable sine signal based on PWM and its implementation on FPGA

Lianzhen HUANG, Jiangang LI, Dongjun ZHANG

期刊论文

Integration of climate change considerations into environmental impact assessment — implementation, problems

I-Shin CHANG, Jing WU

期刊论文

A FEniCS implementation of the phase field method for quasi-static brittle fracture

HIRSHIKESH, Sundararajan NATARAJAN, Ratna Kumar ANNABATTULA

期刊论文

Evaluation of automated in-line precision dairy farming technology implementation in three dairy farms

Maria CARIA, Giuseppe TODDE, Antonio PAZZONA

期刊论文

Impacts of building information modeling (BIM) implementation on design and construction performance:

Dongping CAO, Heng LI, Guangbin WANG

期刊论文