Frontiers of Structural and Civil Engineering >> 2011, Volume 5, Issue 4 doi: 10.1007/s11709-011-0130-x
The Rion-Antirion bridge—when a dream becomes reality
6-8 Avenue Blaise Pascal Cité Descartes, 77455 Champs-sur-Marne Marne la Vallée cedex 2 Paris, France
Next Previous
Abstract
Keywords
bridge ; multi cable-stayed spans ; soil reinforcement ; inclusions ; yield theory ; capacity design ; push-over ; dry dock ; wet dock