Content
Frontiers in Energy >> 2011, Volume 5, Issue 3 doi: 10.1007/s11708-011-0160-z
Numerical simulation of a new hollow stationary dehumidity blade in last stage of steam turbine
1. School of Power and Mechanical Engineering, Wuhan University, Wuhan 430072, China; 2. Shanghai Power Equipment Research Institute, Shanghai 200240, China
Abstract
Keywords
steam turbine ; hollow stationary blade ; dehumidity ; numerical simulation
Content