The Vibration Testing Analysis of Chamber & Deep-hole Pre-splitting Blasting
Shen Zhenyu,Wang Xuguang,Yu Yalun,Liu Honggang
Strategic Study of CAE 2006, Volume 8, Issue 3, Pages 70-74
The vibration testing analysis of blasting in Tai-Chang freeway show that it is chamber & deep-holepre-splitting blasting that can strikingly drop the seismic effect of chamber blasting, so it effectivelysolves some problems of slope stability, slope quality and safety of building & structure that blastingvibration brings about.The improved technique of chamber blasting is beneficial to extending its scope of application so that
Keywords: chamber blasting deep-hole pre-splitting blasting blasting vibration vibration testing analysis
Measurement and characteristics of ground vibration caused by blasting demolition of urban overpass
Hu Jinjun,Yang Yongqiang,Guan Yingjun
Strategic Study of CAE 2014, Volume 16, Issue 11, Pages 90-95
To analyze the ground vibration caused by blasting demolition of urbanof peak acceleration, peak frequency and duration, results indicate that, the vertical component of vibrationregion close to the collapse point; the collapse of bridge segments will lead to superposition of ground vibration, and isolation measures can reduce the peak acceleration but increase the duration of vibration; blastingand collapse vibration cause no damage to the reserved structure which indicates that blasting description
Keywords: blasting demolition urban overpass collapse ground vibration acceleration
Blasting Technologies of Decreasing Vibration in Subway Tunnel Underpass Adjacent Upper Buildings
Fang Junbo
Strategic Study of CAE 2014, Volume 16, Issue 11, Pages 58-64
Reduce the blasting vibration is important for blasting excavation inThe results show that the maximum value of vertical vibration limited in the criterion allowance, andproblems of shock conducting tube detonator delay number difficulty to meet large cross-section tunnel blasting
Keywords: blasting design parallel cut big empty hole delay- time initiation short- hole blasting
Characteristic and Shock Damping of Blast Vibration in a Certain Open Pit
Lin Daneng,Chen Shouru,Liu Youping
Strategic Study of CAE 2006, Volume 8, Issue 6, Pages 73-77
To solve the problem of slope caused by blasting vibration damage at a certain iron mine, YBJ-1 blastingvibration seismometer and CD-1 velocity-meter were used to observe the velocity of particle caused byblasting according to the rock properties and the scale of blasting.the maximum blasting vibration velocity, which will keep slope close to blasting area safe from blastingvibration damage.
Keywords: open pit blasting vibration height effects maximum explosive quantity at the same time millisecond delay
Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 2, Pages 191-204 doi: 10.1007/s11709-022-0906-1
Keywords: drainage box culvert underpass blasting dynamic response numerical simulation safety assessment
Progresses in Explosive Materials and Engineering Blasting
Wang Xuguang
Strategic Study of CAE 2002, Volume 4, Issue 4, Pages 36-40
The progresses in explosive materials and engineering blasting in the recent five years at home and
Keywords: explosive blasting accessories blasting
Study on Blasting Fragmentation Control for Moderate Deep Hole in Underground Mine
Zhao Yanwei,He Dongmei,Li Xianglong,Liu Junxuan
Strategic Study of CAE 2014, Volume 16, Issue 11, Pages 48-52
The scallop moderate longhole blasting mining method in Da Hong-shanIn order to realize the mine production efficient development, the circular moderate longhole blastingThe test results show that circular hole blasting can reduce the block rate is reduced to 10.3%, andthe traditional scallop moderate longhole blasting mining compared with the average lump ore decreasedof detonators, the efficiency of drawing and at the same time, reduce the mining cost ,achieved good blasting
Keywords: The scallop moderate longhole blasting the circular moderate longhole blasting lump ore blasting effect
Design,test and construction of the LKP1000-type movable shot blasting machine
Zhou Chang,Kan Rong ,Zhou Yi,Jiang Qin,Zhu Liang
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 84-88
Shot blasting process is a process which use of shot blasting materialIn order to make the working efficiency and process of shot blasting machine more optimization, thisthrough mathematical analysis and validation adjustment by experimental machine design new type of shot blastingThis research conduct optimize design and discussion for the size and position of key parts of shot blastingwidth reach 1 000 mm, and at the same time ensure best shot blasting effect.
Keywords: shot blasting machine shot blasting apparatus surface treatment experimental machine shot blastingwidth shot blasting effect
Frontiers of Mechanical Engineering 2023, Volume 18, Issue 1, doi: 10.1007/s11465-022-0730-2
Keywords: ultrasonic vibration-assisted grinding perforated ultrasonic vibration platform vibration characteristics
Current Situation and Prospect of Precision Blasting
Xie Xianqi
Strategic Study of CAE 2014, Volume 16, Issue 11, Pages 14-19
Precision blasting is different from control blasting, was regarded as the symbol of development newstage of engineering blasting.With regard to the prospect of precision blasting, following aspects should be studied furthermore: (1) In order to provide theoretical basis of explosive energy release and quantitative blasting designNumerical simulation was an important method for engineering blasting scheme optimization and blasting
Keywords: Precision blasting current situation information technology standardization prospect
New technology of double-pipe protecting borehole wall blasting
Pu Chuanjin,Xiao Zhengxue,Zhang Zhicheng,Hao Yafei
Strategic Study of CAE 2009, Volume 11, Issue 8, Pages 88-92
Double-pipe protecting borehole wall balsting,a new control blastingand directional fracture controlled blasting.The characteristics of the new blasting technology, matching sets and explosion mechanism are detailedlyintroduced in the paper.The results of experiment on single borehole model blasting and tunnel diggingtesting indicate that it has very good blasting effect.
Keywords: blasting engineering double-pipe protecting borehole wall balasting sets blasting mechanism dynamic
Xie Xianqi,Jia Yongsheng,Yao Yingkang,Sun Jinshan,Wu Xinxia,Liu Changbang
Strategic Study of CAE 2014, Volume 16, Issue 11, Pages 65-71
Key technologies of precision blasting were put forward based on characteristics of urban viaductblasting demolition in complicated surroundings.and sequenced collapsed dynamics model were established for quantitative blasting design.Technologies of water pressure blasting were applied in multi-cell box girder fragmentation.The rationality of blasting scheme and parameters were validated by physical model test.
Keywords: viaduct blasting demolition precision blasting instability model initiation network adverse effects control
Recent development of vibration utilization engineering
WEN Bangchun
Frontiers of Mechanical Engineering 2008, Volume 3, Issue 1, Pages 1-9 doi: 10.1007/s11465-008-0017-2
Keywords: utilization engineering non-linear vibration vibration utillization utillization engineering
Forecast and Measurements for Reduction of Dust in Demolition Blasting
Zheng Bingxu,Wei Xiaolin
Strategic Study of CAE 2002, Volume 4, Issue 8, Pages 69-73
A series of technical measurements for dust-laying in demolition blasting of building of a sport center
Keywords: demolition blasting dust forecasting reducing dust high pressure sprinking water film environment protection
Guilian YI, Yunkang SUI, Jiazheng DU
Frontiers of Mechanical Engineering 2011, Volume 6, Issue 2, Pages 229-234 doi: 10.1007/s11465-011-0128-z
To reduce vibration and noise, a damping layer and constraint layer are usually pasted on the innersurface of a gearbox thin shell, and their thicknesses are the main parameters in the vibration andThe normal acceleration of the point on the gearbox surface is the main index that can reflect the vibrationcharacteristics of the whole structure, and the vibration acceleration level is adopted to measure thedegree of the vibration and noise.
Keywords: Abaqus secondary development Python language vibration and noise reduction K-S function vibration acceleration
Title Author Date Type Operation
The Vibration Testing Analysis of Chamber & Deep-hole Pre-splitting Blasting
Shen Zhenyu,Wang Xuguang,Yu Yalun,Liu Honggang
Journal Article
Measurement and characteristics of ground vibration caused by blasting demolition of urban overpass
Hu Jinjun,Yang Yongqiang,Guan Yingjun
Journal Article
Blasting Technologies of Decreasing Vibration in Subway Tunnel Underpass Adjacent Upper Buildings
Fang Junbo
Journal Article
Characteristic and Shock Damping of Blast Vibration in a Certain Open Pit
Lin Daneng,Chen Shouru,Liu Youping
Journal Article
Safety assessment for buried drainage box culvert under influence of underground connected aisle blasting
Journal Article
Study on Blasting Fragmentation Control for Moderate Deep Hole in Underground Mine
Zhao Yanwei,He Dongmei,Li Xianglong,Liu Junxuan
Journal Article
Design,test and construction of the LKP1000-type movable shot blasting machine
Zhou Chang,Kan Rong ,Zhou Yi,Jiang Qin,Zhu Liang
Journal Article
Vibration characteristics and machining performance of a novel perforated ultrasonic vibration platform
Journal Article
New technology of double-pipe protecting borehole wall blasting
Pu Chuanjin,Xiao Zhengxue,Zhang Zhicheng,Hao Yafei
Journal Article
Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings
Xie Xianqi,Jia Yongsheng,Yao Yingkang,Sun Jinshan,Wu Xinxia,Liu Changbang
Journal Article
Forecast and Measurements for Reduction of Dust in Demolition Blasting
Zheng Bingxu,Wei Xiaolin
Journal Article