Search scope:
排序: Display mode:
Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan
Strategic Study of CAE 2014, Volume 16, Issue 8, Pages 33-37
Keywords: bridge engineering span of 700m grade concrete filled steel tubular(CFST) arch bridge design construction
Jinyuan SHI,Zhicheng DENG,Yong WANG,Yu YANG
Frontiers in Energy 2016, Volume 10, Issue 1, Pages 88-104 doi: 10.1007/s11708-015-0387-1
Keywords: 700°C ultra-super-critical unit steam turbine very high pressure rotor structure strength design strength
Shao Jianxiong,Liu Jingwang,Yuan Dafu
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 104-110
In view of the specified design conditions of Three Gorges Project (TGP), the main technical problems that should be considered in the design of hydro turbine generating units are analyzed. The key technical researches performed are summarized and the parameters of hydro turbine generating units are optimized through the study on key technical problems. The unit operation results indicate that the performance of the hydro turbine generating units is excellent, and the units can operate in a safe, stable and highly efficient mode for a long term. Therefore, it is verified effectively that the general technical design of giant hydro turbine generating units is scientific and rational.
Keywords: Three Gorges Project 700 MW hydro turbine generating unit unit capacity design and research operation
Cooling performance of grid-sheets for highly loaded ultra-supercritical steam turbines
Dieter BOHN , Robert KREWINKEL , Shuqing TIAN ,
Frontiers in Energy 2009, Volume 3, Issue 3, Pages 313-320 doi: 10.1007/s11708-009-0036-7
Keywords: steam turbines 700& deg C-technology numerical inverstigation cooling
Fujio Abe
Engineering 2015, Volume 1, Issue 2, Pages 211-224 doi: 10.15302/J-ENG-2015031
Keywords: Ni-base alloy 9%&minus 12% Cr steel creep strength creep-fatigue property welded joint grain boundary microstructure &gamma &prime M23C6 carbide
Title Author Date Type Operation
Feasibility Study on Design and Construction of Concrete Filled Steel Tubular Arch Bridge with a Span of 700m
Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan
Journal Article
Structure improvement and strength finite element analysis of VHP welded rotor of 700°C USC steam turbine
Jinyuan SHI,Zhicheng DENG,Yong WANG,Yu YANG
Journal Article
The design and practice of giant hydro turbine generating units of Three Gorges ProjectShao Jianxiong
Shao Jianxiong,Liu Jingwang,Yuan Dafu
Journal Article
Cooling performance of grid-sheets for highly loaded ultra-supercritical steam turbines
Dieter BOHN , Robert KREWINKEL , Shuqing TIAN ,
Journal Article