Resource Type

Journal Article 5

Year

2016 1

2015 1

2014 1

2011 1

2009 1

Keywords

12% Cr steel 1

700 MW hydro turbine generating unit 1

700& 1

700°C ultra-super-critical unit 1

9%&minus 1

&prime 1

&gamma 1

C-technology 1

M23C6 carbide 1

Ni-base alloy 1

Three Gorges Project 1

bridge engineering 1

concrete filled steel tubular(CFST) arch bridge 1

construction 1

cooling 1

creep strength 1

creep-fatigue property 1

deg 1

design 1

open ︾

Search scope:

排序: Display mode:

Feasibility Study on Design and Construction of Concrete Filled Steel Tubular Arch Bridge with a Span of 700m

Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan

Strategic Study of CAE 2014, Volume 16, Issue 8,   Pages 33-37

Abstract: filled steel tubular (CFST) arch bridge, a feasibility study on design and construction techniques of 700m-spanThe results showed that there are no technical hurdles to build 700m-span CFST arch bridges.economical efficiency, safety and other factors, CFST arch bridge is a strong competitor when building a 700m-span

Keywords: bridge engineering     span of 700m grade     concrete filled steel tubular(CFST) arch bridge     design     construction    

Structure improvement and strength finite element analysis of VHP welded rotor of 700°C USC steam turbine

Jinyuan SHI,Zhicheng DENG,Yong WANG,Yu YANG

Frontiers in Energy 2016, Volume 10, Issue 1,   Pages 88-104 doi: 10.1007/s11708-015-0387-1

Abstract: structure strength design and finite element analysis method for very high pressure (VHP) rotors of the 700The results show that the strength design of improved structure of the VHP welded rotor of the 700°C

Keywords: 700°C ultra-super-critical unit     steam turbine     very high pressure rotor     structure strength design     strength    

The design and practice of giant hydro turbine generating units of Three Gorges ProjectShao Jianxiong

Shao Jianxiong,Liu Jingwang,Yuan Dafu

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 104-110

Abstract:

In view of the specified design conditions of Three Gorges Project (TGP), the main technical problems that should be considered in the design of hydro turbine generating units are analyzed. The key technical researches performed are summarized and the parameters of hydro turbine generating units are optimized through the study on key technical problems. The unit operation results indicate that the performance of the hydro turbine generating units is excellent, and the units can operate in a safe, stable and highly efficient mode for a long term. Therefore, it is verified effectively that the general technical design of giant hydro turbine generating units is scientific and rational.

Keywords: Three Gorges Project     700 MW hydro turbine generating unit     unit capacity     design and research     operation    

Cooling performance of grid-sheets for highly loaded ultra-supercritical steam turbines

Dieter BOHN , Robert KREWINKEL , Shuqing TIAN ,

Frontiers in Energy 2009, Volume 3, Issue 3,   Pages 313-320 doi: 10.1007/s11708-009-0036-7

Abstract: The high pressure steam turbine inlet temperature is expected to be increased up to approximately 700&

Keywords: steam turbines     700&     deg     C-technology     numerical inverstigation     cooling    

and Development of Heat-Resistant Materials for Advanced USC Power Plants with Steam Temperatures of 700 Review

Fujio Abe

Engineering 2015, Volume 1, Issue 2,   Pages 211-224 doi: 10.15302/J-ENG-2015031

Abstract: Materials-development projects for advanced ultra-supercritical (A-USC) power plants with steam temperatures of 700highest temperature boiler and turbine components in order to provide sufficient creep strength at 700

Keywords: Ni-base alloy     9%&minus     12% Cr steel     creep strength     creep-fatigue property     welded joint     grain boundary     microstructure     &gamma     &prime     M23C6 carbide    

Title Author Date Type Operation

Feasibility Study on Design and Construction of Concrete Filled Steel Tubular Arch Bridge with a Span of 700m

Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan

Journal Article

Structure improvement and strength finite element analysis of VHP welded rotor of 700°C USC steam turbine

Jinyuan SHI,Zhicheng DENG,Yong WANG,Yu YANG

Journal Article

The design and practice of giant hydro turbine generating units of Three Gorges ProjectShao Jianxiong

Shao Jianxiong,Liu Jingwang,Yuan Dafu

Journal Article

Cooling performance of grid-sheets for highly loaded ultra-supercritical steam turbines

Dieter BOHN , Robert KREWINKEL , Shuqing TIAN ,

Journal Article

and Development of Heat-Resistant Materials for Advanced USC Power Plants with Steam Temperatures of 700

Fujio Abe

Journal Article