三峡工程运行以来的几个问题思考

工程(英文) ›› 2016, Vol. 2 ›› Issue (4) : 389-397.

PDF(1593 KB)
PDF(1593 KB)
工程(英文) ›› 2016, Vol. 2 ›› Issue (4) : 389-397. DOI: 10.1016/J.ENG.2016.04.002
新闻热点
News & Highlights

三峡工程运行以来的几个问题思考

作者信息 +

Reflections on the Three Gorges Project since Its Operation

Author information +
History +

引用本文

导出引用
. . Engineering. 2016, 2(4): 389-397 https://doi.org/10.1016/J.ENG.2016.04.002

参考文献

[1]
Project Team for TGP’s Staged Assessment of Chinese Academy of Engineering. TGP’s staged assessment report. Beijing: China Water & Power Press; 2010. Chinese.
[2]
Project Team for TGP Assessment during Trial Impoundment Period of Chinese Academy of Engineering. Assessment report on TGP assessment during trial impoundment period. Beijing: China Water & Power Press; 2014. Chinese.
[3]
China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2014. 2015. Chinese.
[4]
Zheng S. Discussion on TGP’s flood resources utilization and exerting integrated benefit. Yangtze River 2013;44(15):1–6. Chinese.
[5]
China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2015. 2016. Chinese.
[6]
Zheng S. Discussion on hydropower resources development and environmental & ecological protection in China. Eng Sci 2006;8(6):1–6. Chinese.
PDF(1593 KB)

Accesses

Citation

Detail

段落导航
相关文章

/