车桥耦合动力分析方法及验证

工程(英文) ›› 2016, Vol. 2 ›› Issue (4) : 528-536.

PDF(2289 KB)
PDF(2289 KB)
工程(英文) ›› 2016, Vol. 2 ›› Issue (4) : 528-536. DOI: 10.1016/J.ENG.2016.04.012
研究论文
Research

车桥耦合动力分析方法及验证

作者信息 +

A Train-Bridge Dynamic Interaction Analysis Method and Its Experimental Validation

Author information +
History +

Abstract

The train-bridge dynamic interaction problem began with the development of railway technology, and requires an evaluation method for bridge design in order to ensure the safety and stability of the bridge and the running train. This problem is studied using theoretical analysis, numerical simulation, and experimental study. In the train-bridge dynamic interaction system proposed in this paper, the train vehicle model is established by the rigid-body dynamics method, the bridge model is established by the finite element method, and the wheel/rail vertical and lateral interaction are simulated by the corresponding assumption and the Kalker linear creep theory, respectively. Track irregularity, structure deformation, wind load, collision load, structural damage, foundation scouring, and earthquake action are regarded as the excitation for the system. The train-bridge dynamic interaction system is solved by inter-history iteration. A case study of the dynamic response of a CRH380BL high-speed train running through a standard-design bridge in China is discussed. The dynamic responses of the vehicle and of the bridge subsystems are obtained for speeds ranging from 200 km·h-1 to 400 km·h-1, and the vibration mechanism are analyzed.

Keywords

Train-bridge dynamic interaction / Wheel/rail relationship / Inter-history iteration / Field measurement / Experimental validation

引用本文

导出引用
. . Engineering. 2016, 2(4): 528-536 https://doi.org/10.1016/J.ENG.2016.04.012

参考文献

[1]
Xia H, de Roeck G, Goicolea JM. Bridge vibration and controls: new research. New York: Nova Science Publishers Inc; 2012.
[2]
Zhang N, Xia H. Dynamic analysis of coupled vehicle—bridge system based on inter-system iteration method. Comput Struct 2013;114-115(1):26–34.
CrossRef ADS Google scholar
[3]
Yang Y, Yau J. An iterative interacting method for dynamic analysis of the maglev train-guideway/foundation-soil system. Eng Struct 2011;33(3):1013–24.
CrossRef ADS Google scholar
[4]
Gao M. Studies on train-track-bridge coupling vibration and train performance on high-speed railway bridges. China Rail Sci 2002;23(2):135–8. Chinese.
[5]
Zhang M, Zhang N, Xia H. Analysis on wind-vehicle-bridge dynamic interaction for lonf-span railway suspension bridge. China Rail Sci 2013;34(4):14–21. Chinese.
[6]
Chen Z, Sun Y, Zhai W. Mapping relationship between pier settlement and rail deformation of high-speed railways—part (I): the unit slab track system. Sci Sinica Tech 2014;44(7):770–7. Chinese.
[7]
Chen Z, Sun Y, Zhai W. Mapping relationship between pier settlement and rail deformation of high-speed railways—part (II): the longitudinal connected ballastless track system. Sci Sinica Tech 2014;44(7):778–85. Chinese.
[8]
Wang K. Study on high speed train running safety under bridge additional deformation [dissertation]. Beijing: Beijing Jiaotong University; 2015. Chinese.
[9]
Guo W, Xia H, Xu Y. Running safety analysis of a train on the Tsing Ma Bridge under turbulent winds. Earthquake Eng Eng Vib 2010;9(3):307–18.
CrossRef ADS Google scholar
[10]
Li Y, Hu P, Xu Y, Zhang M, Liao H. Wind loads on a moving vehicle-bridge deck system by wind-tunnel model test. Wind Struct 2014;19(2):145–67.
CrossRef ADS Google scholar
[11]
Xu Y, Zhang N, Xia H. Vibration of coupled train and cable-stayed bridge system in cross wind. Eng Struct 2004;26(10):1389–406.
CrossRef ADS Google scholar
[12]
Li X, Liu X, Liu D. Coupled vibration analysis of a railway continuous rigid-frame bridge and vehicles with soil-structure interaction. J Vib Shock 2011;30(12):54–8. Chinese.
[13]
Li K, Zhang N, Fang X, Tian Y, Xia H. Dynamic analysis of a vehicle-bridge coupled system considering river scouring. J Vib Shock 2014;33(19):40–7. Chinese.
[14]
Yau J, Frýba L. Response of suspended beams due to moving loads and vertical seismic ground excitations. Eng Struct 2007;29(12):3255–62.
CrossRef ADS Google scholar
[15]
Du X, Xu Y, Xia H. Dynamic interaction of bridge-train system under non-uniform seismic ground motion. Earthquake Eng Struct 2012;41(1):139–57.
CrossRef ADS Google scholar
[16]
Chen L, Zhang N, Jiang L, Zeng Z, Chen G, Guo W. Near-fault directivity pulse-like ground motion effect on high-speed railway bridge. J Cent South Univ 2014;21(6): 2425–36.
CrossRef ADS Google scholar

Acknowledgements

This research is sponsored by the Major State Basic Research Development Program of China (“973” Program) (2013CB036203), the 111 Project (B13002), and the National Natural Science Foundation of China (U1434205, U1434210, 51338001).
Nan Zhang, Yuan Tian, and He Xia declare that they have no conflict of interest or financial conflicts to disclose.
PDF(2289 KB)

Accesses

Citation

Detail

段落导航
相关文章

/