He Zhuang , Liping Feng< , Chao Wen , Qiyuan Peng , Qizhi Tang

工程(英文) ›› 2017, Vol. 3 ›› Issue (1) : 150 -150.

PDF
工程(英文) ›› 2017, Vol. 3 ›› Issue (1) : 150 -150. DOI: 10.1016/J.ENG.2017.01.002

作者信息 +

Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning” 

Author information +
文章历史 +
PDF

引用本文

引用格式 ▾
He Zhuang,Liping Feng<,Chao Wen,Qiyuan Peng,Qizhi Tang. [J]. 工程(英文), 2017, 3(1): 150-150 DOI:10.1016/J.ENG.2017.01.002

登录浏览全文

4963

注册一个新账户 忘记密码

The authors regret to inform that several operation symbols of Eq. (3) and the following sentences are mistaken due to clerical errors.
1. Eq. (3)should be changed to:.
2. “Then the trapezoidal time function of this time interval iswhere r is the preset buffer time in this time interval”should be changed to: “Then the trapezoidal time function of this time interval is,where r is the preset buffer time in this time interval” in the second sentence following the Eq. (3).
The authors would like to apologize for any inconvenience caused.

参考文献

基金资助

()

AI Summary AI Mindmap
PDF

1950

访问

0

被引

详细

导航
相关文章

AI思维导图

/