圣哥达山底隧道的风险、合同管理和融资

工程(英文) ›› 2019, Vol. 5 ›› Issue (3) : 379-383.

PDF(1603 KB)
PDF(1603 KB)
工程(英文) ›› 2019, Vol. 5 ›› Issue (3) : 379-383. DOI: 10.1016/j.eng.2019.04.001
工程成就
Engineering Achievements

圣哥达山底隧道的风险、合同管理和融资

作者信息 +

Risk, Contract Management, and Financing of the Gotthard Base Tunnel in Switzerland

Author information +
History +

引用本文

导出引用
. . Engineering. 2019, 5(3): 379-383 https://doi.org/10.1016/j.eng.2019.04.001

参考文献

[1]
Leuenberger M. In the year of the tunnel. In: Proceeding of the Swiss Tunnel Congress 2016; 2016 Jun 15–17; Luzern, Switzerland. Zurich: Swiss Tunnelling Society; 2016. German.
[2]
Ehrbar H., Zbinden P.. Organisation and processes. In: Tunnelling the Gotthard. Zurich: Swiss Tunnelling Society; 2016. p. 592-601.
[3]
Dix A, Smith M, Celestino T, Neuenschwander M. Contractual practice. 2015-Activity report of Working Group 3 [Internet]. Geneva: ITA-AITES [cited 2019 Feb 19]. Available from: https://www.ita-aites.org/en/wg-committees/working-groups/200-ita-active-working-groups/workinggroup-3-contractual-practices/894-2015-activity-report.
[4]
ITA-AITES. The ITA contractual framework checklist for subsurface construction contracts. Apr. ITA-AITES Report No.: 006
[5]
Ehrbar H., Zbinden P.. Financing and cost management. In: Tunnelling the Gotthard Zurich. Regensdorf: Swiss Tunnelling Society; 2016. p. 614-623.

版权

2019 THE AUTHORS
PDF(1603 KB)

Accesses

Citation

Detail

段落导航
相关文章

/