巨型涡轮机进军海上风电

Sean O'Neill

工程(英文) ›› 2021, Vol. 7 ›› Issue (7) : 894-896.

PDF(1398 KB)
PDF(1398 KB)
工程(英文) ›› 2021, Vol. 7 ›› Issue (7) : 894-896. DOI: 10.1016/j.eng.2021.06.003
新闻热点

巨型涡轮机进军海上风电

作者信息 +

Giant Turbines Poised to Claim Offshore Wind

Author information +
History +

引用本文

导出引用
Sean O'Neill. 巨型涡轮机进军海上风电. Engineering. 2021, 7(7): 894-896 https://doi.org/10.1016/j.eng.2021.06.003

参考文献

[1]
Haliade-X wind turbine technical specifications [Internet]. Paris: GE Renewable Energy; c2021 [cited 2021 Mar 23]. Available from: https://www. ge.com/renewableenergy/wind-energy/offshore-wind/haliade-x-offshore-turbine.
[2]
GE’s Haliade-X 14 MW turbine to debut at Dogger Bank C [Internet]. Port of Tyne: Dogger Bank Wind Farm; 2020 Dec 18 [cited 2021 Mar 23] Available from: https://doggerbank.com/press-releases/ges-haliade-x-14mw-turbineto-debut-at-dogger-bank-c/.
[3]
Voltaire offshore jack-up installation vessel. Aalst: Jan De Nul.
[4]
Moore J, Bullard N. BNEF executive factbook—power, transport, buildings and industry, commodities, food and agriculture, capital. London: BloombergNEF; 2021 Mar.
[5]
Powered by change: Siemens Gamesa launches 14 MW offshore direct drive turbine with 222-meter rotor [Internet]. Zamudio: Siemens Gamesa; 2020 May 19 [cited 2021 Mar 23]. Available from: https://www.siemensgamesa. com/en-int/newsroom/2020/05/200519-siemens-gamesa-turbine-14-222-dd.
[6]
MySE11-203, hybrid drives the world [Internet]. Zhongshan: Mingyang Smart Energy Group Co., Ltd.; [cited 2021 Mar 23]. Available from: http://www. myse.com.cn/en/jtxw/info.aspx?itemid=773.
[7]
Vestas—V236-15.0 MWTM. Aarhus: Vestas Wind Systems; 2021.
[8]
Lee J, Zhao F. Global offshore wind report 2020. Brussels: Global Wind Energy Council; 2020 Aug.
[9]
China installed half of new global offshore wind capacity during 2020 in record year [Internet]. Brussels: Global Wind Energy Council; 2021 Feb 25 [cited 2021 Mar 23]. Available from: https://gwec.net/china-installed-half-of-new-globaloffshore-wind-capacity-during-2020-in-record-year/.
[10]
Fact sheet: Biden administration jumpstarts offshore wind energy projects to create jobs [Internet]. Washington, DC: The White House; 2021 Mar 29 [cited 2021 Apr 10]. Available from: https://www.whitehouse.gov/briefing-room/ statements-releases/2021/03/29/fact-sheet-biden-administration-jumpstartsoffshore-wind-energy-projects-to-create-jobs/.
[11]
Weiss P. Airborne wind energy prepares for take off. Engineering 2020;6 (2):107–9.
[12]
Weiss P. After highflyer crashes, airborne wind energy regroups. Engineering 2021;7(3):277–9.
[13]
Ambrose J. Good vibrations: bladeless turbines could bring wind power to your home [Internet]. London: The Guardian; 2021 Mar 16 [cited 2021 Mar 23]. Available from: https://www.theguardian.com/environment/2021/mar/ 16/good-vibrations-bladeless-turbines-could-bring-wind-power-to-your-home.
[14]
Vortex Bladeless: how it works—first wind turbine without blades nor gears [Internet]. Madrid: Vortex Bladeless; [cited 2021 Mar 23]. Available from: https://vortexbladeless.com/technology-design/.
PDF(1398 KB)

Accesses

Citation

Detail

段落导航
相关文章

/