
年15万吨规模燃煤电厂燃烧后二氧化碳捕集示范工程
Qingru Cui, Rui Zhao, Tiankun Wang, Shuai Zhang, Yan Huang, Yongzheng Gu, Dong Xu
工程(英文) ›› 2022, Vol. 14 ›› Issue (7) : 22-26.
年15万吨规模燃煤电厂燃烧后二氧化碳捕集示范工程
A 150 000 t·a−1 Post-Combustion Carbon Capture and Storage Demonstration Project for Coal-Fired Power Plants
[1] |
Gao W, Liang S, Wang R, Jiang Q, Zhang Yu, Zheng Q, et al. Industrial carbon dioxide capture and utilization: state of the art and future challenges. Chem Soc Rev 2020;49(23):8584–686.
|
[2] |
Eide LI, Batum M, Dixon T, Elamin Z, Graue A, Hagen S, et al. Enabling large-scale carbon capture, utilisation, and storage (CCUS) using offshore carbon dioxide (CO2) infrastructure developments—a review. Energies 2019;12(10):1945.
|
[3] |
Dumée L, Scholes C, Stevens G, Kentish S. Purification of aqueous amine solvents used in post combustion CO2 capture: a review. Int J Greenhouse Gas Control 2012;10:443–55.
|
[4] |
Zhang X. Application prospect of CCUS in China under the target of carbon neutrality. China Sustainability Trib 2020;12:22–4. Chinese.
|
/
〈 |
|
〉 |