高寒地区混凝土井塔快速施工关键技术的研究

吴春杰,程正觉,国重宽,刘慧

中国工程科学 ›› 2011, Vol. 13 ›› Issue (11) : 72 -80.

PDF (3040KB)
中国工程科学 ›› 2011, Vol. 13 ›› Issue (11) : 72 -80.

高寒地区混凝土井塔快速施工关键技术的研究

作者信息 +

Key technology of concrete headframe construction in alpine areas

Author information +
文章历史 +
PDF (3112K)

摘要

在西北高寒地区钢筋混凝土井塔施工中,通过对桩基范围人工冻土的快速解冻技术和高寒地区冬期井塔快速施工成套技术的研究应用,确保了工程质量,加快了井塔桩基和冬期井塔主体的施工速度,缩短了井塔施工工期,解决了高寒地区煤矿建设周期长的施工技术瓶颈问题。

Abstract

During the reinforced concrete headframe construction in alpine areas in Northwest China, by the research and application of rapid thawing technology in pile foundation range and rapid headframe construction technology in winter, the project quality can be ensured; the construction speed of headframe pile foundation and headframe body in winter was accelerated; the time of headframe construction was shortened and the bottleneck problems of coal mine construction in alpine areas were solved.

关键词

西北高寒地区 / 钢筋混凝土井塔 / 人工冻融土 / 快速解冻 / 冬期 / 井塔冬期快速施工成套技术

Key words

alpine areas in Northwest China / reinforced concrete headframe / artificial frost-thawed soil / quick freezing / in winter / tower rapid construction technology in winter

Author summay

吴春杰(1971— ) ,男,安徽明光市人,高级工程师,主要研究方向为土建工程施工技术

引用本文

引用格式 ▾
吴春杰,程正觉,国重宽,刘慧 高寒地区混凝土井塔快速施工关键技术的研究[J]. 中国工程科学, 2011, 13(11): 72-80 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (3040KB)

178

访问

0

被引

详细

导航
相关文章

AI思维导图

/