300m级面板堆石坝适应性及对策研究
300 m grade concrete faced rockfill dam adaptability and countermeasures
系统总结了200m级面板坝建设的主要经验与教训,对4座300m级面板坝典型工程进行了分析,提出了300m级面板坝需要研究的基础科学和关键技术问题。
This paper summed up the main experiences and lessons of 200 m grade rockfill dam construction,analyzed 4 typical projects of 300 m grade dam, put forward the scientific research and key technical problems of 300 m grade dam.
concrete face rockfill dam / adaptability / countermeasure research
马洪琪(1942—),男,上海市人,中国工程院院士,教授级高级工程师,华能澜沧江水电有限公司高级顾问,研究方向为水利水电工程施工
/
〈 |
|
〉 |