大直径盾构负环管片拆除及隧道换装技术

翟志国,黄学军,杨志永

中国工程科学 ›› 2010, Vol. 12 ›› Issue (12) : 83 -88.

PDF (1161KB)
中国工程科学 ›› 2010, Vol. 12 ›› Issue (12) : 83 -88.

大直径盾构负环管片拆除及隧道换装技术

作者信息 +

The negative ring demolition and tunnel refitting technique of large diameter tube

Author information +
文章历史 +
PDF (1188K)

摘要

通过对北京铁路地下直径线2标工程的研究,确定在刀盘改造期间进行负环管片拆除的一系列工作,重点如部分反力架的拆除方法、负环管片的详细拆除方法以及拆除反力架后临时支撑的架设方法,同时就泥水盾构隧道的换装技术进行了叙述,最终在7 d之内成功拆除了7环负环管片,节约了工期,保证了后继施工的材料运输速度。

Abstract

Through introducing the construction method of negative ring demolition during transforming cutter head and replacement technique of Beijing Rail Transit Line 2 bid section in detail, the experience of negative ring demolition and replacement techniques of large diameter slurry shield were summarized, which would provide reference to the implementation of the construction scheme.

关键词

大直径盾构 / 负环管片 / 拆除 / 隧道换装

Key words

big diameter shield / negative ring / demolition / tunnel reconstruction

Author summay

翟志国(1979—),男,河北邢台县人,工程师,主要从事盾构施工技术

引用本文

引用格式 ▾
翟志国,黄学军,杨志永 大直径盾构负环管片拆除及隧道换装技术[J]. 中国工程科学, 2010, 12(12): 83-88 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (1161KB)

232

访问

0

被引

详细

导航
相关文章

AI思维导图

/