工程网络计划的LR型模糊系数线性规划方法

高朋,冯俊文

中国工程科学 ›› 2009, Vol. 11 ›› Issue (2) : 70 -74.

PDF (735KB)
中国工程科学 ›› 2009, Vol. 11 ›› Issue (2) : 70 -74.

工程网络计划的LR型模糊系数线性规划方法

作者信息 +

Linear programming method with LR type fuzzy numbersfor network scheduling

Author information +
文章历史 +
PDF (752K)

摘要

工程网络计划的基础是对各工序持续时间的估计,而导致工序工期不确定性的因素不仅具有随机性,通常也具有模糊性。文章提出一种具有LR型模糊数的线性规划模型,解决了工程网络计划的时间参数 估计和关键路径识别问题,并通过引入λ截集来充分描述决策者在不同情形下对工序工期估计的可信程度。 最后给出一实例详细说明了该方法的应用过程及有效性。

Abstract

Estimation of activity duration is a basic problem for project scheduling. However, the uncertainty of activity duration originates from both probability and fuzziness in the real world. This paper develops a linear programming method with LR type fuzzy numbers, which aims to estimate activity duration and identify critical path, and applies the λ - cut to indicate the degree of optimism of a decision maker. Finally, an example is given to demonstrate the application and validity of the proposed method.

关键词

工程网络计划 / 模糊线性规划 / 工序

Key words

network scheduling / fuzzy linear programming / activity

Author summay

冯俊文(1960-),男,山西太原市人,南京理工大学教授,研究方向为管理决策分析

引用本文

引用格式 ▾
高朋,冯俊文 工程网络计划的LR型模糊系数线性规划方法[J]. 中国工程科学, 2009, 11(2): 70-74 DOI:

登录浏览全文