三峡船闸完建期156 m蓄水位4级运行方式原型调试研究

胡亚安,张瑞凯,李云

中国工程科学 ›› 2009, Vol. 11 ›› Issue (9) : 52 -58.

PDF (749KB)
中国工程科学 ›› 2009, Vol. 11 ›› Issue (9) : 52 -58.

三峡船闸完建期156 m蓄水位4级运行方式原型调试研究

作者信息 +

Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period

Author information +
文章历史 +
PDF (766K)

摘要

从水力学条件论证了船闸采用4级运行方案的可行性。通过原型调试,采取中间及阐首优化后的输水方式运行,基本消除了闸室第一分流口空化,船闸在超过设计的45.2 m水头下工作条件较好,在三峡船闸完建期156 m蓄水位船闸采用4级运行方式具优越性。

Abstract

This paper expounds the superiority of adopting four-step operational mode for TGP lock under impounded level 156 m in the finishing construction period, and demonstrates the feasibility of adopting four-step operational mode with the hydraulic conditions. After adopting the optimizing water conveyance pattern by means of prototype debug, the cavitation of the 1st-bifurcation at mid chamber has been basically eliminated, the working conditions of the lock under exceeding design water head 45.2 m has been confirmed well, therefore, the four-step operational mode can be adopted for TGP lock.

关键词

三峡船闸 / 运行方式 / 原型调试

Key words

TGP lock / operational mode / prototype debugging

Author summay

胡亚安(1965-),男,湖北云梦县人,南京水利科学研究院教授级高工,长期从事通航水力学研究

引用本文

引用格式 ▾
胡亚安,张瑞凯,李云 三峡船闸完建期156 m蓄水位4级运行方式原型调试研究[J]. 中国工程科学, 2009, 11(9): 52-58 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (749KB)

42

访问

0

被引

详细

导航
相关文章

AI思维导图

/