青藏铁路多年冻土区桥梁施工关键技术

陈鹏

中国工程科学 ›› 2005, Vol. 7 ›› Issue (7) : 27 -33.

PDF (4192KB)
中国工程科学 ›› 2005, Vol. 7 ›› Issue (7) : 27 -33.
技术创新

青藏铁路多年冻土区桥梁施工关键技术

    陈鹏
作者信息 +

The Key Technology for Building Bridges in Perennially Frozen Earth Area During Constructing Qinghai - Tibet Railway

Author information +
文章历史 +
PDF (4291K)

摘要

介绍了青藏铁路多年冻土区桩基的施工技术及严寒大温差条件下的混凝土施工方案;讨论了耐久混凝土的应用及质量控制,耐久混凝土非结构性开裂情况、开裂原因及裂缝防治措施。

Abstract

This paper aims to give a compendious introduction of some key technologies in constructing Qinghai-Tibet railway project,which includes : bored pile building technology in perennially frozen earth area, concrete construction schemes under frosty conditions with big difference in temperature, applications and quality control of perdurable concrete, perdurable concrete's cracking cases, cracking reasons and some preventive measures for it.

关键词

多年冻土 / 钻孔桩 / 耐久混凝土 / 混凝土裂缝

Key words

perennially frozen earth / bored pile / perdurable concrete / crack of concrete

引用本文

引用格式 ▾
青藏铁路多年冻土区桥梁施工关键技术[J]. 中国工程科学, 2005, 7(7): 27-33 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (4192KB)

1247

访问

0

被引

详细

导航
相关文章

AI思维导图

/