三峡工程永久船闸关键技术

樊启祥

中国工程科学 ›› 2004, Vol. 6 ›› Issue (1) : 48 -52.

PDF (3605KB)
中国工程科学 ›› 2004, Vol. 6 ›› Issue (1) : 48 -52.
技术创新

三峡工程永久船闸关键技术

作者信息 +

Key Technical Issues of TGP Permanent Shiplock

Author information +
文章历史 +
PDF (3690K)

摘要

三峡工程双线五级船闸通航建筑物的总体布置,涉及泥沙淤积碍航、船闸输水系统水力学、高陡边坡处理、主要金属结构及机电设备制造和技术等方面问题都有特殊要求,必须通过充分的科学试验、论证和工程实践,逐步予以解决。

Abstract

To solve the high-dam navigation issue of the world class Three Gorges Project (TGP) is one of the key technical issues of the TGP. Special requirements exist in the TGP double-lane five-step shiplock in terms of general layout of navigation structures, sedimentation hindering to navigation, hydraulics of the water-conveyance system, high and steep slope treatment, manufacture and technology of main metal structures and mechanical and electric equipment, which have been resolved step by step by scientific tests, verification and engineering practice.

关键词

通航建筑物 / 输水系统 / 高陡边坡 / 水力学

Key words

navigation structures / water-conveyance system / high and steep slope / hydraulics

引用本文

引用格式 ▾
樊启祥 三峡工程永久船闸关键技术[J]. 中国工程科学, 2004, 6(1): 48-52 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (3605KB)

348

访问

0

被引

详细

导航
相关文章

AI思维导图

/