三峡工程建设中若干重大技术问题的突破

张超然,戴会超

中国工程科学 ›› 2003, Vol. 5 ›› Issue (2) : 20 -25.

PDF (4796KB)
中国工程科学 ›› 2003, Vol. 5 ›› Issue (2) : 20 -25.
专题报告

三峡工程建设中若干重大技术问题的突破

作者信息 +

Technical Breakthroughs in the Construction of TGP

Author information +
文章历史 +
PDF (4910K)

摘要

三峡工程规模巨大,技术复杂。文章介绍了三峡工程建设在大江截流和混凝土防渗墙施工技术、大坝混凝土快速施工新技术、船闸高边坡施工技术、电站大型钢衬钢筋混凝土压力管道和蜗壳保温保压技术、沥青混凝土心墙、船闸金属结构、水轮发电机组等重大技术问题上的突破。

Abstract

The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made on the issues such as river closure of the Grand Channel and concrete construction of the cutoff wall, prompt concrete construction of dam, high slope construction of permanent shiplock, large-scale steel-lined reinforced concrete penstocks of power station and temperature and pressure maintaining of the spiral case, asphalt concrete core wall, metal works of the shiplock, turbine generating units, and so on.

关键词

三峡工程 / 重大技术 / 突破

Key words

Three Gorges Project / key technique / breakthroughs

引用本文

引用格式 ▾
张超然,戴会超 三峡工程建设中若干重大技术问题的突破[J]. 中国工程科学, 2003, 5(2): 20-25 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (4796KB)

41

访问

0

被引

详细

导航
相关文章

AI思维导图

/