三峡工程对葛洲坝枢纽下游近坝段水位与航道影响研究

陆永军,陈稚聪,赵连白,邵学军,杨美卿,李云中

中国工程科学 ›› 2002, Vol. 4 ›› Issue (10) : 67 -72.

PDF (3543KB)
中国工程科学 ›› 2002, Vol. 4 ›› Issue (10) : 67 -72.
研究报告

三峡工程对葛洲坝枢纽下游近坝段水位与航道影响研究

作者信息 +

Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream The Gezhouba Project

Author information +
文章历史 +
PDF (3627K)

摘要

根据实测地形和水文泥沙资料,分析了葛洲坝枢纽运用后宜昌河段的河床冲淤变化、推移质和床沙的粗化以及枯水位的变化。由数学模型计算和物理模型试验成果,预测了三峡工程施工期及初期运用阶段葛洲坝枢纽近坝段水位下降及对通航的影响。

Abstract

The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data. The water level lowering and it's impact on navigation in the period of construction and initial stage operation of the Three Gorges project are predicted by use of the results of mathematical and physical model.

关键词

葛洲坝枢纽 / 三峡工程 / 冲刷 / 水位下降 / 船闸与航道 / 数学模型 / 物理模型

Key words

Gezhouba project / Three Gorges project / erosion / water level lowering / navigation lock and navigation channel / mathematical model / physical model

引用本文

引用格式 ▾
陆永军,陈稚聪,赵连白,邵学军,杨美卿,李云中 三峡工程对葛洲坝枢纽下游近坝段水位与航道影响研究[J]. 中国工程科学, 2002, 4(10): 67-72 DOI:

登录浏览全文

4963

注册一个新账户 忘记密码

参考文献

AI Summary AI Mindmap
PDF (3543KB)

40

访问

0

被引

详细

导航
相关文章

AI思维导图

/